Temporary Two-Way Bike Lane for Construction @everydayengineering
Temporary Two-Way Bike Lane for Construction  @everydayengineering
Uploaded December 2024 | Updated September 2026, 2 weeks ago
On Broadway between Ames and Galileo in Cambridge, MA. The previous one-way bike lane that I start out in is shifted to the opposite side of the street to accommodate the large construction zone on the north side, while vehicle traffic is now one-way facing the camera. This was such an interesting layout to see as it appears all the signal work to make this happen just involved swapping some signal lenses in a creative way. It’s cool to see a city take such detailed measures for bike access through work zones like this, as most American cities would just install a “bike lane ends” sign and hope they figure it out.
Temporary Two-Way Bike Lane for ConstructionCourt St New HavenValley Street Traffic Calming ProjectBackyard Rain GardenRoute 34 Widening Project (Derby, CT)MBTA Green Line ExtensionPavement CoresDriveway Retrofit pt. 1Mallorca Sunset EclipseNew Vertical Arrows at No Left Turn IntersectionRingling Blvd Bike Lanes - Sarasota, FLHoboken - A Model for Pedestrian Safety
Everyday Engineering |

Temporary Two-Way Bike Lane for Construction

SHARE TO X SHARE TO REDDIT SHARE TO FACEBOOK WALLPAPER