We had to take down this 1979 chimney to connect our home addition — and I'd never done it before. Armed with a mini excavator, hammer chisel, and a jackhammer, here's how it went (spoiler: it only took about 2 hours).
This chimney originally served a wood stove in the basement, which we removed during the remodel — that stove now lives on in our backyard hockey rink warming house, and we installed a new wood stove on the first floor instead.
Want to collaborate on this project or be a sponsor?
More info here: diyprojectacademy.com/collaborate
In this video:
Breaking apart the chimney blocks above the roof, one at a time, with a rotary hammer drill and chisel
Using the mini excavator to push and collapse the main chimney structure
Removing the base/foundation with a jackhammer (first time using this tool — $150 on Amazon)
Hauling off 3,200 lbs of concrete debris (cost: $77 to dump)
Total time: about 2 hours for the chimney, plus 1.5 hours for disposal runs
This is Episode 2 of our Home Addition series, where we're documenting the entire build from start to finish — the wins, the mistakes, and the real costs involved. If you're new here, welcome — I'm Pete, and I hope this gives you ideas or at least a good look at what's involved in a project like this.
🔗 Rotary hammer drill: amzn.to/44LecUl
🔗 Jackhammer: amzn.to/4p5rioV
🔗 Dump trailer (Southland Trailers, US/Canada): southlandtrailers.com/where-to-buy/#main
If you're enjoying this series, drop a comment letting me know what you're working on, and subscribe to follow along with the rest of the Home Addition build.
0:00 Intro
0:24 Removing chimney above roof
1:52 Removing main chimney with mini excavator
4:17 Chimney foundation removal with Jackhammer
6:24 Disposal of chimney and wrap up
#ChimneyRemoval #HomeAddition #DIYDemolition
We had to take down this 1979 chimney to connect our home addition — and I'd never done it before. Armed with a mini excavator, hammer chisel, and a jackhammer, here's how it went (spoiler: it only took about 2 hours).
This chimney originally served a wood stove in the basement, which we removed during the remodel — that stove now lives on in our backyard hockey rink warming house, and we installed a new wood stove on the first floor instead.
Want to collaborate on this project or be a sponsor?
More info here: diyprojectacademy.com/collaborate
In this video:
Breaking apart the chimney blocks above the roof, one at a time, with a rotary hammer drill and chisel
Using the mini excavator to push and collapse the main chimney structure
Removing the base/foundation with a jackhammer (first time using this tool — $150 on Amazon)
Hauling off 3,200 lbs of concrete debris (cost: $77 to dump)
Total time: about 2 hours for the chimney, plus 1.5 hours for disposal runs
This is Episode 2 of our Home Addition series, where we're documenting the entire build from start to finish — the wins, the mistakes, and the real costs involved. If you're new here, welcome — I'm Pete, and I hope this gives you ideas or at least a good look at what's involved in a project like this.
🔗 Rotary hammer drill: amzn.to/44LecUl
🔗 Jackhammer: amzn.to/4p5rioV
🔗 Dump trailer (Southland Trailers, US/Canada): southlandtrailers.com/where-to-buy/#main
If you're enjoying this series, drop a comment letting me know what you're working on, and subscribe to follow along with the rest of the Home Addition build.
0:00 Intro
0:24 Removing chimney above roof
1:52 Removing main chimney with mini excavator
4:17 Chimney foundation removal with Jackhammer
6:24 Disposal of chimney and wrap up