Uploaded April 2026 | Updated November 2026, 3 days ago
Today on Tales From Underground, we start from beach umbrellas and end up discussing engineering in the Roman era.
Humanity has ALWAYS had problems driving and securing elements into the ground… then the Romans came along, with 94.7% engineering in their DNA.
Engineering efficiency, “ancient” edition. 🏛️⚒️
Today on Tales From Underground, we start from beach umbrellas and end up discussing engineering in the Roman era.
Humanity has ALWAYS had problems driving and securing elements into the ground… then the Romans came along, with 94.7% engineering in their DNA.
Engineering efficiency, “ancient” edition. 🏛️⚒️







![New Orleans East Back Levee LPV-111 Improvement - TreviIcos [TreviGroup]
TreviIcos & Soilmec on biggest soil mixing project in U.S.
The Project was awarded by the USACE as Early Contractor Involvement (ECI) to expedite the contractor selection and project construction schedule. As part of the ECI contract, TREVIICOS was actively involved in the finalization of the design and constructability.
Over 5 miles of levee were stabilized employing a total of 8 drill rigs, single and double auger, carrying 5.25 ft diameter mixing tools. DMM elements were distributed in buttresses perpendicular to the levee axis and spaced 15.5 ft on-center. The elements were installed from a working platform, built with material resulting from the mixing operations, through mostly clayey and organic (peat) soils, and were keyed into the more competent Pleistocene layer. The DMM was installed and maximum depth reached was 70 ft.
The LPV111 East Back Levee Improvement Project is located along the Gulf Intracoastal Waterway in Orleans Parish of New Orleans and it is an essential component of the New Orleans Hurricane Protection System. The existing levee sections suffered extensive damages from Hurricane Katrina, such that the US Army Corps of Engineers elected to provide earth stabilization and rebuild the levee sections as part of the Greater New Orleans Hurricane Storm Damage Risk Reduction System. Due to the adverse geotechnical properties of the foundation soils, wet Deep Mixing Method (DMM) was selected to stabilize the existing ground conditions ahead of the new levee installation.
TREVIICOS: is the subsidiary U.S. company of TREVI, set up in 1997 when the Groups Underground Engineering and Tunneling Division acquired ICOS Boston, a company with a 40-year history of success and innovation in the U.S. New Orleans East Back Levee LPV-111 Improvement - TreviIcos [TreviGroup]](https://i.ytimg.com/vi/oyj3-g8GBwM/mqdefault.jpg)


