Stuttgart 21: Drilling Blasting Holes at Tunnel Construction at Ulmer Straße @soundsofchanges7145
Stuttgart 21: Drilling Blasting Holes at Tunnel Construction at Ulmer Straße  @soundsofchanges7145
Uploaded July 2019 | Updated September 2026, 2 weeks ago
Stuttgart 21 is one of the biggest construction projects in Germany. It includes the underground construction of a new central station for the city of Stuttgart as well as the creation of a new network of tracks and tunnels that allows high speed trains to pass in the area, possibly reduces travelling times and connects Stuttgart to international transport networks. It is conducted by Deutsche Bahn and co-financed by public money.
However, despite enthusiasm from its founders and the industry, the project has been heavily criticised. Not only has it become much more expensive than expected, but there are also doubts about the efficiency and safety of the new central station as well as about the actual benefit of the high speed tracks. Moreover, the construction fuelled protests and many discussions on protected buildings and nature reserves within the city such as historic parks.
Large parts of the train tracks arriving at the new station will run through underground tunnels. One of the construction sites was at Ulmer Straße just outside of the city centre. There the tunnel is expanded by blasting. For blasting a new section of the tunnel blasting holes are drilled into the wall at its end. In this recording you can hear an Atlas Copco Boomer with a two armed drilling rig.

Sound: Kathinka Engels
Photo and Video: Konrad Gutkowski
Stuttgart 21: Drilling Blasting Holes at Tunnel Construction at Ulmer StraßeLocomotive built by Đuro Đaković, acceleration and hornHorizontal milling machine59 REZKALNI STROJ STEINEL VRTANJE, snem  A, obdelanCoal Mine Prosper Haniel XXTraffic on a cobbled street - soundscapeThe Velenje Coal Mine, Coal transport from langwall face with chain conveyorThe Velenje Coal Mine, Running of the monorail diesel locomotiveStuttgart 21: Diesel Locomotives at Logistics Centrehsilta4 movieIDRIJA, ANTHONY`S SHAFT; A WINCH FOR LOWERING WOODPackagingCoal Mine Prosper Haniel VIII
Sounds of Changes |

Stuttgart 21: Drilling Blasting Holes at Tunnel Construction at Ulmer Straße

SHARE TO X SHARE TO REDDIT SHARE TO FACEBOOK WALLPAPER