Stress Absorbing Membrane Interlayer (SAMI) - Concrete pavement overlays @tarmacltd
Stress Absorbing Membrane Interlayer (SAMI) - Concrete pavement overlays  @tarmacltd
Uploaded July 2021 | Updated November 2026, 4 days ago
Concrete pavements demand flexible solutions to cracking. From laboratory testing and failure modes on concrete overlay, Nick Thom of Nottingham University demonstrates the Stress Absorbing membrane interlayer (SAMI) solution for concrete pavement overlays.

00:48 Effect of temperature variation
01:44 Effect of traffic
02:26 How to measure crack resistance
04:13 Simulate SAMI system in laboratory
08:01 Develop a predictive approach
10:05 Extend to real life pavement
16:33 SAMI Conclusion

#concretefloor
#sami
#concretesami
Stress Absorbing Membrane Interlayer (SAMI) - Concrete pavement overlaysRecycling at TarmacTarmac Graduates and ApprenticeshipsToplight C - 60 London WallTarmac - Workforce HeroesPorous pavements and SuDS pavement designNext Gen 2030+ | Event HighlightsHollie Kirk, Customer Services Apprentice - TarmacTarmac Careers - Reinvent Your WorldPant Quarry Film Locations at TarmacAbbie Fryatt - Tarmac ApprenticeNRP Full width planing - M54
Tarmac |

Stress Absorbing Membrane Interlayer (SAMI) - Concrete pavement overlays

SHARE TO X SHARE TO REDDIT SHARE TO FACEBOOK WALLPAPER