Uploaded May 2026 | Updated September 2026, 2 weeks ago
Booster 19 and Ship 39 are now in final pre-launch testing after the successful first Block 3 full stack WDR at Pad 2. Launch is currently targeted for no earlier than May 19.
β‘ Become a member of NASASpaceflight's channel for exclusive Discord access, fast turnaround clips, and other exclusive benefits. Your support helps us continue our 24/7 coverage. Click JOIN above to get started.β‘
Narration by John Galloway.
π₯ Video from Ceaser G, Colleen, Gage, and Starbase Live.
βοΈ Edited by Thomas Hayden (@_thomashayden).
π If you are interested in using footage from this video, please review our content use policy: nasaspaceflight.com/content-use-policy
L2 Boca Chica (more clips and photos) from BC's very early days to today.
π forum.nasaspaceflight.com/index.php?topic=47107.0
(Join L2 and support NSF here: nasaspaceflight.com/l2/)
Timestamps:
0:00 Pad 2 Tower Vent Removed
0:27 New Tower Vent Installed
1:15 Crews in the Ship QD Arm
1:41 Wet Dress Rehearsal
1:51 Vehicle Stands Clear the Area
2:52 Watch the Stack Shrink
4:13 DSS Activation
4:20 Deluge Activation
4:38 Stack Detanked
6:07 Ship QD Disconnected
6:22 Full Speed Disconnect Test
6:31 Second Disconnect Test
6:45 Ship 39 Destacked
7:52 Ship 39 Rolled Back
9:22 Booster 19 Getting Ready to Leave
9:42 Booster 19 Lifted off Pad 2
10:59 Booster 19 Rolled Back
LDAPAABJRG2UMCU3
Booster 19 and Ship 39 are now in final pre-launch testing after the successful first Block 3 full stack WDR at Pad 2. Launch is currently targeted for no earlier than May 19.
β‘ Become a member of NASASpaceflight's channel for exclusive Discord access, fast turnaround clips, and other exclusive benefits. Your support helps us continue our 24/7 coverage. Click JOIN above to get started.β‘
Narration by John Galloway.
π₯ Video from Ceaser G, Colleen, Gage, and Starbase Live.
βοΈ Edited by Thomas Hayden (@_thomashayden).
π If you are interested in using footage from this video, please review our content use policy: nasaspaceflight.com/content-use-policy
L2 Boca Chica (more clips and photos) from BC's very early days to today.
π forum.nasaspaceflight.com/index.php?topic=47107.0
(Join L2 and support NSF here: nasaspaceflight.com/l2/)
Timestamps:
0:00 Pad 2 Tower Vent Removed
0:27 New Tower Vent Installed
1:15 Crews in the Ship QD Arm
1:41 Wet Dress Rehearsal
1:51 Vehicle Stands Clear the Area
2:52 Watch the Stack Shrink
4:13 DSS Activation
4:20 Deluge Activation
4:38 Stack Detanked
6:07 Ship QD Disconnected
6:22 Full Speed Disconnect Test
6:31 Second Disconnect Test
6:45 Ship 39 Destacked
7:52 Ship 39 Rolled Back
9:22 Booster 19 Getting Ready to Leave
9:42 Booster 19 Lifted off Pad 2
10:59 Booster 19 Rolled Back
LDAPAABJRG2UMCU3










