Requirements for an industrial ADS Demo:
- Beam Energy: 600 - 800 MeV protons to produce neutrons via spallation.
- Beam Power: Pbeam 5-10 MWatt.
- Optimized Power efficiency: h=Pbeam/Pgrid
- Minimized beam losses: internal losses under 200 Watt.
- Reliability: reduced down time compared to alternative designs; fewer beam trips
- Beam stability: choice of Ion source with multiple injection systems (to reduce beam trips)
- Low investment and running costs
- Low number of components
- Easy access to components (RF cavities, RF amplifiers, injection and extraction devices, ion sources…)
Solution: 600MeV 10mA proton Single Stage Cyclotron Driver S2CD...
- 20-30 % power efficiency
- Multiple injection systems for increased reliability and reduced beam trips
- Small footprint and weight for investment cost reduction
- Easy maintenance thanks to fewer parts, swappable cavities
Single stage accelerator...
- Compact system - low construction budget and Low operational cost
- Less components than traditional solutions so high reliability
- No transport / no matching issues between stages
3 sources + axial injection lines (2 sources On + 1 source in Stand-by)...
- redundancy
- Reliability
- Intensity Flexibility
Simplified Extraction system (No Septum required)...
- Increasing reliability
- less activation so easier maintenance
Time Line is 5 years.
Costs Estimates is 130/140 M€ including beam lines and ancillary equipment.
This talk was captured at Thorium Energy Conference 2018 (ThEC2018) in Brussels, Belgium. The footage may be recycled by ThoriumRemix.com for narrative purposes. Thorium Energy (World) conferences can be found here: thoriumenergyworld.com
ThEC2018 videos are collected in this ThEC2018 Playlist: youtube.com/playlist?list=PLKfir74hxWhPll2rp9pJO2oiCceFccHls
Requirements for an industrial ADS Demo:
- Beam Energy: 600 - 800 MeV protons to produce neutrons via spallation.
- Beam Power: Pbeam 5-10 MWatt.
- Optimized Power efficiency: h=Pbeam/Pgrid
- Minimized beam losses: internal losses under 200 Watt.
- Reliability: reduced down time compared to alternative designs; fewer beam trips
- Beam stability: choice of Ion source with multiple injection systems (to reduce beam trips)
- Low investment and running costs
- Low number of components
- Easy access to components (RF cavities, RF amplifiers, injection and extraction devices, ion sources…)
Solution: 600MeV 10mA proton Single Stage Cyclotron Driver S2CD...
- 20-30 % power efficiency
- Multiple injection systems for increased reliability and reduced beam trips
- Small footprint and weight for investment cost reduction
- Easy maintenance thanks to fewer parts, swappable cavities
Single stage accelerator...
- Compact system - low construction budget and Low operational cost
- Less components than traditional solutions so high reliability
- No transport / no matching issues between stages
3 sources + axial injection lines (2 sources On + 1 source in Stand-by)...
- redundancy
- Reliability
- Intensity Flexibility
Simplified Extraction system (No Septum required)...
- Increasing reliability
- less activation so easier maintenance
Time Line is 5 years.
Costs Estimates is 130/140 M€ including beam lines and ancillary equipment.
This talk was captured at Thorium Energy Conference 2018 (ThEC2018) in Brussels, Belgium. The footage may be recycled by ThoriumRemix.com for narrative purposes. Thorium Energy (World) conferences can be found here: thoriumenergyworld.com