Uploaded October 2026 | Updated November 2026, 2 days ago
When PATCO replaced the direct fixation system on its elevated sections, the rubber block improved shock isolation has also allowed the rails to "sing" while trains are moving on the viaduct as the bridge structure no longer dampens the vibrations.
Here a westbound trains departs the Collingswood station on a fall evening allowing the rails to sing for the 40 or so seconds it takes for the train to reach the more solid ballasted track.
When PATCO replaced the direct fixation system on its elevated sections, the rubber block improved shock isolation has also allowed the rails to "sing" while trains are moving on the viaduct as the bridge structure no longer dampens the vibrations.
Here a westbound trains departs the Collingswood station on a fall evening allowing the rails to sing for the 40 or so seconds it takes for the train to reach the more solid ballasted track.










