Uploaded January 2025 | Updated November 2026, 3 hours ago
Managing boil off gas on LNG carriers is a complex challenge because the composition in boil off gas can change over time, boil off gas needs to be managed during the voyage, and vessels need to arrive at the discharge port with temperature and pressure below a specified level.
'Vessels sometimes even have to have sail in circles to achieve required cargo temperature and pressures', says Konrad Gessler, Director, Ship Performance Product Management at Danelec.
In this webinar from Danelec, we'll look at how simulation tools can make predictions in advance and support better decision making, to avoid delays at the discharge port.
The operational decisions have complex impacts on cargo pressure, temperature, and rate of change in concentration. Simulation tools can make it much easier. They can generate recommendations for the best way to meet different objectives, whether to avoid delays, maximise LNG delivery, minimise fuel costs, or minimise emissions.
Managing boil off gas on LNG carriers is a complex challenge because the composition in boil off gas can change over time, boil off gas needs to be managed during the voyage, and vessels need to arrive at the discharge port with temperature and pressure below a specified level.
'Vessels sometimes even have to have sail in circles to achieve required cargo temperature and pressures', says Konrad Gessler, Director, Ship Performance Product Management at Danelec.
In this webinar from Danelec, we'll look at how simulation tools can make predictions in advance and support better decision making, to avoid delays at the discharge port.
The operational decisions have complex impacts on cargo pressure, temperature, and rate of change in concentration. Simulation tools can make it much easier. They can generate recommendations for the best way to meet different objectives, whether to avoid delays, maximise LNG delivery, minimise fuel costs, or minimise emissions.










