Shoreliner, M3A, M7, and M8 Sets past Green Lane Railroad Crossing, Bedford Hills, NY @RaisedLetter
Shoreliner, M3A, M7, and M8 Sets past Green Lane Railroad Crossing, Bedford Hills, NY  @RaisedLetter
Uploaded July 2026 | Updated September 2026, 1 week ago
This is no joke, I got all types of Metro-North sets in about 20 minutes. No real expectations, no heads up, but just stuck around to get some trains over Green Lane and left more surprised than anything. The M8 set was the real surprise although they can run just like the rest of them on 3rd Rail. It was also my first time seeing a new Metro-North Charger. Wished it was a P32 but was still happy to see it.
The last time I was up around here, nearly no signals had bells. Now they all have at minimum 2 bells.
Shoreliner, M3A, M7, and M8 Sets past Green Lane Railroad Crossing, Bedford Hills, NYMBTA Red Line Announcement: Alewife 4 Car Train ApproachingVRE Gallery Car V823 Door Closing ChimeBank Street Connector Railroad Crossing, New London, CTMBTA Blue Line Train arriving at StateMBTA Green Line Train arriving at Hynes Convention CenterMBTA Master of Transportation - Park Street AnnouncementMBTA Defect Detector in Andover, MAWater Street Railroad Crossing, Orange, MA w/ NS 1068POV: You ride MBTA Red LinePNLX 9619 leading Old Cab Cars out of FitchburgMBTA 1059 at Groton-Harvard Road Crossing
Raised Letter |

Shoreliner, M3A, M7, and M8 Sets past Green Lane Railroad Crossing, Bedford Hills, NY

SHARE TO X SHARE TO REDDIT SHARE TO FACEBOOK WALLPAPER