Set up BricsCAD for AEC project scalability┃V26 Breakout Session @OctaveBricsCAD
Set up BricsCAD for AEC project scalability┃V26 Breakout Session  @OctaveBricsCAD
Uploaded October 2025 | Updated September 2026, 2 weeks ago
Understand the updates to the BSYSLIB project database in BricsCAD V26, and best practices to set up and deploy a new project. In this session, we cover what updates we've made, show you how you can create a new project in BricsCAD, and how to populate it with the details you need. You'll also see the project database in action from tender to fabrication and on-site markups.

Visit the Bricsys site to discover what else is new in #BricsCAD V26: brics.ly/3JhVw7J

If you're looking for #TheTrueCADAlternative, look no further - license today: brics.ly/4nkKfRP

Already using BricsCAD?
Upgrade to V26 and experience the latest and greatest tools BricsCAD has to offer: brics.ly/47e5Uqi

Want to try BricsCAD V26 for free?
Start your 30-day free trial: brics.ly/4obwPZB
Set up BricsCAD for AEC project scalability┃V26 Breakout SessionWorkflow integration maximizes productivity | PERIs Octave BricsCAD storyManaging user profiles│Lesson 4/16 | BricsCAD Essentials Course V26Saving over 50% annually with CAD ownership | Rots Maatwerks Octave BricsCAD storyModeling | BricsCAD BIM Essentials V26 | Lesson 4/22Connecting 2D and 3D manufacturing workflows | Mazdas Octave BricsCAD storyCustomizing BricsCADs User Interface #shorts80% savings on CAD licensing and zero downtime │ADG Engineers BricsCAD StoryLinks and imports| BricsCAD BIM Essentials V26 | Lesson 5/22Whats new in V26 for BricsCAD Lite and Pro for 2D drafting┃V26 Breakout SessionBuild assemblies with constraints, parameters, tables | BricsCAD Mechanical Essentials | Lesson 9/19What BricsCAD can do for civil and survey workflows #shorts
Octave BricsCAD |

Set up BricsCAD for AEC project scalability┃V26 Breakout Session

SHARE TO X SHARE TO REDDIT SHARE TO FACEBOOK WALLPAPER