Select a Plot Area for Graph Tool Analysis (Capstone) @pascohowdoi
Select a Plot Area for Graph Tool Analysis (Capstone)  @pascohowdoi
Uploaded May 2025 | Updated September 2026, 3 weeks ago
How do I select which of multiple graph plot areas an analysis tool will apply to in PASCO Capstone?

Recorded with PASCO Capstone version 2.9 (released November 2024).
Select a Plot Area for Graph Tool Analysis (Capstone)Find the Difference in Coordinates between Two Data Points (Capstone)Quickly Graph Non-Sensor Data with Manual Entry (Sparkvue 5)Switch to Dark Mode (Sparkvue 5)Set a Shared Zero Position between Smart Cart Runs (Capstone)Quickly Configure Manual Sampling (Capstone)Control Output Signals (Sparkvue 5)Change the Color of a Run (Sparkvue 5)Make a Run or Measurement Active for Graph Analysis (Sparkvue 5)Change the Measurement Shown in a Display (Sparkvue 5)Find Changes between Graphed Data Points (Sparkvue 5)Switch a Graph from 2 Plot Areas to 2 Y-Axes (Sparkvue 5)
PASCO How Do I? |

Select a Plot Area for Graph Tool Analysis (Capstone)

SHARE TO X SHARE TO REDDIT SHARE TO FACEBOOK WALLPAPER