Second inspection in PCV R2 (part 3 of 7) @hilbert00
Second inspection in PCV R2 (part 3 of 7)  @hilbert00
Uploaded March 2012 | Updated November 2026, 3 hours ago
Fukushima Nuclear Accident

Second inspection with a boroscope + thermocouple + ionization chamber inside the primary containment vessel of reactor 2.

Part 1: youtu.be/-eGbkDy5428
Part 2: youtu.be/yTBSmW6Z4wc
Part 3: youtu.be/EU4SIbQx35k
Part 4: youtu.be/vtQ2bT3W7ps
Part 5: youtu.be/cwytRus1KTM
Part 6: youtu.be/n6GgzV982Ss
Part 7: youtu.be/SNVF0Ex4vHo
Second inspection in PCV R2 (part 3 of 7)Exploring Fukushima reactor 2 (part 3 of 6)Fukushima Core Status (2/2)Unit 6 leakage filter sludge tank room passage in the trench justSurvey and Cleaning in Unit 3 Reactor Building at Fukushima Daiichi Nuclear Power Station (1/3)Unit 6 leakage filter sludge tank room passage in the trenchEquipment falling during the removal of debris from SFP3Unit 5 house transformer room south hill sidewater flood in Unit 6 switchgear room (part 6 of 6)The Evaluation Status of Reactor Core Damage at Fukushima Daiichi (2/2)TEPCO president visiting Fukushima DaiichiInvestigation inside reactor 1 with underwater CCD (full)
Antonio Bulgheroni (toto) |

Second inspection in PCV R2 (part 3 of 7)

SHARE TO X SHARE TO REDDIT SHARE TO FACEBOOK WALLPAPER