Scaffoldless Rail Installation Part 3 | Installation and Alignment | Wurtec @WurtecInc
Scaffoldless Rail Installation Part 3 | Installation and Alignment | Wurtec  @WurtecInc
Uploaded May 2016 | Updated September 2026, 2 weeks ago
Wurtec’s Plumb Line Drop Tool and Rail Alignment
Starter Kit are used to determine where the first pair of main elevator rails should be installed. The worker will position the preset Wurtec Drop Line Tool at the top of the hoist way. He will then drop two weighted Music Wires from the ends of the Drop Line Tool down the hoistway. He will then check the position of the music wire against the hoistway wall at each of the landings.
Scaffoldless Rail Installation Part 3 | Installation and Alignment | WurtecTwelve Days of Tools | Wurtec Rail BlocksWurtec Weight CartsElevator Mechanics Toolkit | Safety GearWurtec Manufacturing | Made in the USAWUR-COM Installation | Part 2 - Lobby StationHeavy Duty Rail Pointers Demo | WurtecTwelve Days of Tools | Sentinel Hydraulic Elevator ControllerTwelve Days of Tools | Wurtec Weight CartsElevator Governor Overspeed Test WheelElevator Communications Sale!  Save 10% on Select Wurtec ProductsT-Rail Hoist Rig Demo | Wurtec
Wurtec, Inc. |

Scaffoldless Rail Installation Part 3 | Installation and Alignment | Wurtec

SHARE TO X SHARE TO REDDIT SHARE TO FACEBOOK WALLPAPER