Scaffoldless Rail Installation Part 2 | Rail Hoisting | Wurtec @WurtecInc
Scaffoldless Rail Installation Part 2 | Rail Hoisting | Wurtec  @WurtecInc
Uploaded May 2016 | Updated November 2026, 3 hours ago
With the ground floor elevator rails in place at the bottom of the hoist way, the Wurtec False Car is ready to install one half at a time. Position one side against the rail and set the proper clearance of 1/8” from the face of the rail. Set the False Car Safety at the same clearance. Position and mount the other half of the Wurtec False Car in the same manner and bolt the cross braces to secure in place.
Scaffoldless Rail Installation Part 2 | Rail Hoisting | WurtecElevator Safety Barriers by Wurtec #elevatormechanic #elevatorsTop of Car Handrail Demo | WurtecWurtec - American-Made and Family-Owned Since 1985Twelve Days of Tools | Wurtec Temporary Escalator StepsWurtec Governor Overspeed WheelDeleted videoRail Pointer Demo | WurtecGolo Winch Demo | WurtecDeleted videoDeleted videoMARCH MADNESS SALE! Fixator Personnel Hoist & Wire Rope
Wurtec, Inc. |

Scaffoldless Rail Installation Part 2 | Rail Hoisting | Wurtec

SHARE TO X SHARE TO REDDIT SHARE TO FACEBOOK WALLPAPER