Russian-language version: Machine assembly phase one @iterorganization
Russian-language version: Machine assembly phase one  @iterorganization
Uploaded March 2021 | Updated November 2026, 3 days ago
In this video drawn directly from ITER CAD data, you can follow the step-by-step progression of component installation in the Tokamak pit. The first two pieces (the base and lower cylinder of the cryostat) are already in place; see what comes next as the 23,000-tonne ITER machine is built from bottom to top in the huge concrete "assembly pit" at the centre of the Tokamak Building.
Russian-language version: Machine assembly phase oneITER, an energy for our future (English subtitles)ITER Talks (5): Machine assemblyITER Project Site by Drone - June 2020ITER ring magnet: into the cold chamberA 56-tonne Helium dryer installed in the ITER cryoplantITER Private Sector Fusion WorkshopRide4Fusion (in italiano)ITER NOW 1.6: The Power Of Women @iterorganizationTime-lapsing through machine assembly (May 2020-March 2021)PRACTISING THE EMBRACEITER by drone - December 2025 update
iterorganization |

Russian-language version: Machine assembly phase one

SHARE TO X SHARE TO REDDIT SHARE TO FACEBOOK WALLPAPER