Learn more about the RTC Prater Way Rehabilitation Project, a planned roadway improvement from Pyramid Way to Probasco Way in Sparks, Nevada.
This virtual presentation outlines why the project is needed, existing safety concerns, and the proposed improvements designed to reduce crashes, slow vehicle speeds, and improve safety for people walking, biking, driving, and using transit. Viewers will also learn about alternatives that were considered, traffic analysis findings, right-of-way impacts, and the current project schedule.
While the proposed changes are expected to result in a minor increase in travel time, the project prioritizes long-term safety benefits, including improved pedestrian crossings, buffered bike lanes, and traffic calming measures—particularly near schools and residential neighborhoods.
Topics covered in this video include:
• Project background and pavement rehabilitation needs
• Existing corridor conditions and crash history
• Alternatives evaluated and the recommended road diet
• Traffic analysis and travel time impacts
• Pedestrian, bicycle, and transit improvements
• Right-of-way considerations
• Construction timeline and next steps
📍 Project Limits: Pyramid Way to Probasco Way, Sparks, NV
🚧 Planned Construction: Spring 2026 – Fall 2026 (subject to change)
For questions or comments, please contact Project Manager Kim Diegle at kdiegle@rtcwashoe.com
or (775) 335-1844.
Learn more about the RTC Prater Way Rehabilitation Project, a planned roadway improvement from Pyramid Way to Probasco Way in Sparks, Nevada.
This virtual presentation outlines why the project is needed, existing safety concerns, and the proposed improvements designed to reduce crashes, slow vehicle speeds, and improve safety for people walking, biking, driving, and using transit. Viewers will also learn about alternatives that were considered, traffic analysis findings, right-of-way impacts, and the current project schedule.
While the proposed changes are expected to result in a minor increase in travel time, the project prioritizes long-term safety benefits, including improved pedestrian crossings, buffered bike lanes, and traffic calming measures—particularly near schools and residential neighborhoods.
Topics covered in this video include:
• Project background and pavement rehabilitation needs
• Existing corridor conditions and crash history
• Alternatives evaluated and the recommended road diet
• Traffic analysis and travel time impacts
• Pedestrian, bicycle, and transit improvements
• Right-of-way considerations
• Construction timeline and next steps
📍 Project Limits: Pyramid Way to Probasco Way, Sparks, NV
🚧 Planned Construction: Spring 2026 – Fall 2026 (subject to change)
For questions or comments, please contact Project Manager Kim Diegle at kdiegle@rtcwashoe.com
or (775) 335-1844.