Renovation Part 4 @AndysBOWL
Renovation Part 4  @AndysBOWL
Uploaded July 2012 | Updated September 2026, 1 week ago
A very short vid, the end is in sight! Next steps: designing the new Masking Unit and the Side Wall. I have to do some repairs on the pinsetters, then it's finished. the alley is manually operated BUT for the future i will think about how to build a controlled automatically GSX pinsetter! That will be the last step to perfection!
Renovation Part 4Last Look180 GameTesting Ball Return MechanismSome shotsHome Bowling AlleyDry Bowling LanesAndy on (Bowling) Tour - RomeTesting Lighting System200 Bowling Game 2014-02-17Cosmic BowlingBowling 142 Game
Andys BOWL |

Renovation Part 4

SHARE TO X SHARE TO REDDIT SHARE TO FACEBOOK WALLPAPER