Regardless of your skill level, QUIKRETE® concrete mixes can make pouring a sidewalk, patio, or floor an attainable task for almost anyone.
Begin with forms that are sturdy and level, and fill the bottom 3 to 4 inches of the space with QUIKRETE® All-Purpose Gravel. Spread the gravel evenly and use a tamp to compact it. This solid sub-base helps prevent erosion and slab settling. Next, dampen the gravel with a garden hose to cool it down and help prevent shrinkage cracking, especially in hot temperatures.
Now you’re ready to begin pouring the concrete mix in evenly placed mounds. The top of the concrete should be about 2 to 3 inches above the forms before leveling begins. Using a hoe, consolidate and distribute the concrete evenly so that the surface is relatively flat and slightly above the forms. Next, use a straight 2x4, long enough to rest on the opposite side of the form, to screed the concrete. Moving the board back and forth across the surface in a sawing motion removes the excess concrete and smooths the surface. If you have low areas, add more concrete and screed level again. This may require several passes.
Once the concrete has lost its sheen, use a wood float in an arcing motion to smooth the surface. This is important because it consolidates the concrete and brings cement to the surface, which is necessary for a durable finish.
Once the slab is thumbprint hard, consolidate and shape the edges of the slab using an edging tool to give it a finished look. Make several passes in each direction for a smooth finish. Next, use a concrete groover and a straight edge to cut control joints. These narrow depressions allow for expansion and contraction of the concrete slab. A 4-inch thick slab will require control joints at a minimum of every 10 ft. in each direction, and each should be cut to at least one-fourth the depth of the slab.
Now, use a stiff bristle broom to create a non-slip broom finish by gently pulling the broom across the surface. Be sure to make all the broom strokes in the same direction. After the broom, make another pass with the edger and the groover to trim out the slab. Freshly placed concrete should be water-cured for a minimum of 3 to 5 days with a fine water mist. Alternatively, and easier, water curing can be eliminated by applying QUIKRETE® Acrylic Concrete Cure and Seal immediately after finishing the concrete. Acrylic Cure and Seal can be applied with a roller, garden sprayer, or brush, and will also provide a semi-gloss sheen that repels water and protects the concrete from oil, grease, and food stains.
Regardless of your skill level, QUIKRETE® concrete mixes can make pouring a sidewalk, patio, or floor an attainable task for almost anyone.
Begin with forms that are sturdy and level, and fill the bottom 3 to 4 inches of the space with QUIKRETE® All-Purpose Gravel. Spread the gravel evenly and use a tamp to compact it. This solid sub-base helps prevent erosion and slab settling. Next, dampen the gravel with a garden hose to cool it down and help prevent shrinkage cracking, especially in hot temperatures.
Now you’re ready to begin pouring the concrete mix in evenly placed mounds. The top of the concrete should be about 2 to 3 inches above the forms before leveling begins. Using a hoe, consolidate and distribute the concrete evenly so that the surface is relatively flat and slightly above the forms. Next, use a straight 2x4, long enough to rest on the opposite side of the form, to screed the concrete. Moving the board back and forth across the surface in a sawing motion removes the excess concrete and smooths the surface. If you have low areas, add more concrete and screed level again. This may require several passes.
Once the concrete has lost its sheen, use a wood float in an arcing motion to smooth the surface. This is important because it consolidates the concrete and brings cement to the surface, which is necessary for a durable finish.
Once the slab is thumbprint hard, consolidate and shape the edges of the slab using an edging tool to give it a finished look. Make several passes in each direction for a smooth finish. Next, use a concrete groover and a straight edge to cut control joints. These narrow depressions allow for expansion and contraction of the concrete slab. A 4-inch thick slab will require control joints at a minimum of every 10 ft. in each direction, and each should be cut to at least one-fourth the depth of the slab.
Now, use a stiff bristle broom to create a non-slip broom finish by gently pulling the broom across the surface. Be sure to make all the broom strokes in the same direction. After the broom, make another pass with the edger and the groover to trim out the slab. Freshly placed concrete should be water-cured for a minimum of 3 to 5 days with a fine water mist. Alternatively, and easier, water curing can be eliminated by applying QUIKRETE® Acrylic Concrete Cure and Seal immediately after finishing the concrete. Acrylic Cure and Seal can be applied with a roller, garden sprayer, or brush, and will also provide a semi-gloss sheen that repels water and protects the concrete from oil, grease, and food stains.