Uploaded May 2026 | Updated September 2026, 3 weeks ago
SpaceX is preparing for Flight 12 with both the vehicles and the pad, the latter involving numerous impressive Deluge tests on Pad 2.
⚡ Become a member of NASASpaceflight's channel for exclusive Discord access, fast turnaround clips, and other exclusive benefits. Your support helps us continue our 24/7 coverage. Click JOIN above to get started.⚡
Narration by John Galloway.
🎥 Video from Ceaser G, Colleen, Gage, and Starbase Live.
✂️ Edited by Thomas Hayden (@_thomashayden).
🔍 If you are interested in using footage from this video, please review our content use policy: nasaspaceflight.com/content-use-policy
L2 Boca Chica (more clips and photos) from BC's very early days to today.
🔗 forum.nasaspaceflight.com/index.php?topic=47107.0
(Join L2 and support NSF here: nasaspaceflight.com/l2/)
Timestamps:
0:00 Full Pad 2 Deluge Test
1:30 Second Deluge Test
2:53 Third Deluge Test
4:03 Orbital Pad 1
4:19 Pad 1’s Service Structure
4:37 Work on the Air Separation Unit
5:22 Vertical Tank Waiting for Install
5:31 Work on Air Compressor Housing
5:57 Something Attached to a Nosecone
6:26 Gigabay Construction
6:52 Ship 39’s Heatshield
7:26 Ship 39 Rolled to Massey’s
10:35 Ship 39 Testing
LDAPAABJRG2UMCU3
SpaceX is preparing for Flight 12 with both the vehicles and the pad, the latter involving numerous impressive Deluge tests on Pad 2.
⚡ Become a member of NASASpaceflight's channel for exclusive Discord access, fast turnaround clips, and other exclusive benefits. Your support helps us continue our 24/7 coverage. Click JOIN above to get started.⚡
Narration by John Galloway.
🎥 Video from Ceaser G, Colleen, Gage, and Starbase Live.
✂️ Edited by Thomas Hayden (@_thomashayden).
🔍 If you are interested in using footage from this video, please review our content use policy: nasaspaceflight.com/content-use-policy
L2 Boca Chica (more clips and photos) from BC's very early days to today.
🔗 forum.nasaspaceflight.com/index.php?topic=47107.0
(Join L2 and support NSF here: nasaspaceflight.com/l2/)
Timestamps:
0:00 Full Pad 2 Deluge Test
1:30 Second Deluge Test
2:53 Third Deluge Test
4:03 Orbital Pad 1
4:19 Pad 1’s Service Structure
4:37 Work on the Air Separation Unit
5:22 Vertical Tank Waiting for Install
5:31 Work on Air Compressor Housing
5:57 Something Attached to a Nosecone
6:26 Gigabay Construction
6:52 Ship 39’s Heatshield
7:26 Ship 39 Rolled to Massey’s
10:35 Ship 39 Testing
LDAPAABJRG2UMCU3










