Uploaded November 2025 | Updated November 2026, 2 hours ago
A summary of the August and September 2025 EPD Laboratories work episode: the pole installations, the long line repair, the hilltop shack and its equipment, and the seismic streaming page at epdlabs.org. Aaron covers where the recordings and the stream will live, notes that at the time of recording the page carries a sample rather than a continuous feed, and says a newsletter will go out when everything is live. Donation routes for the 501(c)(3) and where Eric Dollard's presentations can be found are also covered.
Chapters
0:00 What the season covered
7:00 Pole work and line repair
14:58 The shack and its equipment
20:33 Seismic streaming page and next steps
epdlabs.org/seismic-streaming
ericpdollard.com/donate
emediapress.com/product-category/authors-presenters/eric-dollard
emediapress.com
emediapress.com/energytimes
EPD Laboratories, 2025 Aug-Sep earth signals work episode. Posted 2025-11-13.
A summary of the August and September 2025 EPD Laboratories work episode: the pole installations, the long line repair, the hilltop shack and its equipment, and the seismic streaming page at epdlabs.org. Aaron covers where the recordings and the stream will live, notes that at the time of recording the page carries a sample rather than a continuous feed, and says a newsletter will go out when everything is live. Donation routes for the 501(c)(3) and where Eric Dollard's presentations can be found are also covered.
Chapters
0:00 What the season covered
7:00 Pole work and line repair
14:58 The shack and its equipment
20:33 Seismic streaming page and next steps
epdlabs.org/seismic-streaming
ericpdollard.com/donate
emediapress.com/product-category/authors-presenters/eric-dollard
emediapress.com
emediapress.com/energytimes
EPD Laboratories, 2025 Aug-Sep earth signals work episode. Posted 2025-11-13.







