Pile augaring. @bradmielke4614
Pile augaring.  @bradmielke4614
Uploaded May 2014 | Updated September 2026, 2 hours ago
Drilled concrete pilings installed in clay strata. This is the augaring phase prior to the belling of the pile.
Pile augaring.Vibratory pad-foot compactorTruck 6Using a screed - demolitionHydraulic Knuckle-boom craneCompact 3Track loader back-fill pt 1HE BackfillMichener Park - Building E.  2025Front loader with fill sandTele-belt placing drainage granularBack-fill at catch basin
Brad Mielke for CONENGTECH |

Pile augaring.

SHARE TO X SHARE TO REDDIT SHARE TO FACEBOOK WALLPAPER