Uploaded December 2014 | Updated September 2026, 1 hour ago
The ASARCO Ray Mine is always looking to maximize haul truck availability, lower fuel consumption and enhance overall performance. Repowering equipment is a key strategy to accomplish those goals, and when it became apparent that the mine’s fleet of Liebherr T 282B 400-ton haul trucks needed engine replacement, a Cummins team offered ASARCO a unique proposal. The team promised to build a complete turnkey module, replacing the competitive engine and installing the turnkey module in a three-day time frame. For more information on Cummins mining engines, visit cumminsengines.com/mining.
The ASARCO Ray Mine is always looking to maximize haul truck availability, lower fuel consumption and enhance overall performance. Repowering equipment is a key strategy to accomplish those goals, and when it became apparent that the mine’s fleet of Liebherr T 282B 400-ton haul trucks needed engine replacement, a Cummins team offered ASARCO a unique proposal. The team promised to build a complete turnkey module, replacing the competitive engine and installing the turnkey module in a three-day time frame. For more information on Cummins mining engines, visit cumminsengines.com/mining.










