Package 3: Flight path options @AirservicesTV
Package 3: Flight path options  @AirservicesTV
Uploaded July 2025 | Updated September 2026, 1 week ago
The Noise Action Plan for Brisbane is Airservices Australia’s plan to reduce the impact of aircraft noise on the communities of the wider Brisbane area. The plan was developed to address impacts resulting from changes to Brisbane’s airspace, following the introduction of Brisbane Airport's new parallel runway in July 2020.

Airservices is actively engaging with the wider Brisbane community and industry discussing potential flight path proposals developed in response to the Plan.

This video explains the approach taken in developing noise sharing options to reduce the frequency and concentration of flight paths over some communities.

Package 3 of the Noise Action Plan for Brisbane focuses on multiple concepts for flight path changes developed by specialist flight path and airspace design consultancy, Trax International.
Package 3: Flight path optionsAvoiding Airspace Infringements in the Perth Basin | Safety Short | VFR Pilots 🛩️🚁  #pilotsafetyThe powerful story of Airservices AustraliaThe Career For the Future - Become an Air Traffic Controller with Airservices AustraliaAirservices Australia - Safe operations around controlled and restricted airspace - Safety netWhy our people joined the Aviation Rescue Fire Fighting ServiceAirservices Australia Aviation Rescue Fire Fighters. A Career for the future.787 lands at SydneyRecruitment at Airservices - Technical OfficerJasmyn Hewett, Aviation Rescue Fire Fighting Recruit - CC version (30 sec)ADS-B in AustraliaHow Brisbanes airspace operates
Airservices Australia |

Package 3: Flight path options

SHARE TO X SHARE TO REDDIT SHARE TO FACEBOOK WALLPAPER