Uploaded July 2024 | Updated September 2026, 2 weeks ago
You’re looking at Block 03, our first prototype keel block for the Hunter Class Frigate Program!
This is the first block to require blast and paint activity in confined spaces. This 13 week process saw additional control measures introduced and new paints used for the first time.
Weighing 151 tonnes, and travelling at 1km/hour, the block then made its way through the shipyard to its next stop – the Block Outfitting and Erection Hall.
Check out the details and specs of the future Hunter class frigates at baesystems.com/en-aus/what-we-do/hunter?utm_source=youtube&utm_medium=YT-video-description&utm_campaign=hcfp&utm_content=block03
You’re looking at Block 03, our first prototype keel block for the Hunter Class Frigate Program!
This is the first block to require blast and paint activity in confined spaces. This 13 week process saw additional control measures introduced and new paints used for the first time.
Weighing 151 tonnes, and travelling at 1km/hour, the block then made its way through the shipyard to its next stop – the Block Outfitting and Erection Hall.
Check out the details and specs of the future Hunter class frigates at baesystems.com/en-aus/what-we-do/hunter?utm_source=youtube&utm_medium=YT-video-description&utm_campaign=hcfp&utm_content=block03










![Introducing Mantlet™ and Mantlet Edge™ [Full version]
When survival depends on seeing without being seen, we’ve created the most advanced, portable, passive RF digital Electronic Support Measures ever built — and it’s derived from the proven Mantlet system.
Learn about Mantlet™ and Mantlet Edge™ at https://www.baesystems.com/en-aus/product/mantlet-and-mantlet-edge?utm_source=YouTube&utm_medium=YouTube+description&utm_campaign=Mantlet&utm_content=Mantlet+full Introducing Mantlet™ and Mantlet Edge™ [Full version]](https://i.ytimg.com/vi/W2XRAGzwzQ8/mqdefault.jpg)