Uploaded September 2026 | Updated November 2026, 3 hours ago
Try out our free Off-grid power builder: mobilemusthave.com/pages/off-grid-power-system-configurator
This is Part 2 of our off-grid power install series. We don't just sell power systems; we run them. We're building a full off-grid system on my own RV, start to finish.
In this video, Erik and I tour my 2026 Alliance Paradigm 395DS (no generator, three rooftop ACs, 50 amp, six people living in it), look at where the power actually goes, and check out the install bay. Then we pick the system: a 24V Pro bundle with dual 3,000VA inverters, two batteries, a high-draw 12V DC module for the hydraulic jacks and slides, and 1,000W of new solar, for about 1,400W on the roof in total.
Missed Part 1? Watch it here: youtu.be/ACEkhuQLdEU
Series playlist: youtube.com/playlist?list=PLBq6Of3gn_8I
WANT A SYSTEM LIKE THIS?
Off-grid power systems: mobilemusthave.com/pages/off-grid-power
Talk to a power expert (free consult): mobilemusthave.com/pages/talk-to-a-power-expert
Subscribe so you don't miss the next part of the build. youtube.com/@MobileMustHave?sub_confirmation=1
#offgridpower #rvlife #solarpower #lithiumbattery #rvsolar #fifthwheel #mobilemusthave #offgridliving
0:00 Intro
1:04 Meet the RV: 2026 Alliance Paradigm 395DS
2:01 The power baseline: no generator, 3 ACs, 50 amp
2:44 Inside tour: where the power goes
3:41 The propane stove that needs shore power
4:49 12V loads: lights and the macerating toilet
5:32 Install bay: where the batteries and inverters go
6:45 The factory inverter loop problem
8:08 50 amp panel quirk: everything on one leg
9:47 Hydraulic jacks, slides and other 12V motors
10:54 Module 1: heavy 12V DC loads
12:06 24V system, 2 batteries, more solar
13:01 Single vs. dual inverter bundles
14:14 What the engineering consult changed
14:55 Why "one and a half big loads" isn't real
16:46 The pick: Pro bundle
16:59 Solar survey: four 250W panels
19:25 Build summary
19:35 Dual inverters in parallel, explained
20:45 What if you have an onboard generator?
21:51 Next up: the pre-ship validation call
Try out our free Off-grid power builder: mobilemusthave.com/pages/off-grid-power-system-configurator
This is Part 2 of our off-grid power install series. We don't just sell power systems; we run them. We're building a full off-grid system on my own RV, start to finish.
In this video, Erik and I tour my 2026 Alliance Paradigm 395DS (no generator, three rooftop ACs, 50 amp, six people living in it), look at where the power actually goes, and check out the install bay. Then we pick the system: a 24V Pro bundle with dual 3,000VA inverters, two batteries, a high-draw 12V DC module for the hydraulic jacks and slides, and 1,000W of new solar, for about 1,400W on the roof in total.
Missed Part 1? Watch it here: youtu.be/ACEkhuQLdEU
Series playlist: youtube.com/playlist?list=PLBq6Of3gn_8I
WANT A SYSTEM LIKE THIS?
Off-grid power systems: mobilemusthave.com/pages/off-grid-power
Talk to a power expert (free consult): mobilemusthave.com/pages/talk-to-a-power-expert
Subscribe so you don't miss the next part of the build. youtube.com/@MobileMustHave?sub_confirmation=1
#offgridpower #rvlife #solarpower #lithiumbattery #rvsolar #fifthwheel #mobilemusthave #offgridliving
0:00 Intro
1:04 Meet the RV: 2026 Alliance Paradigm 395DS
2:01 The power baseline: no generator, 3 ACs, 50 amp
2:44 Inside tour: where the power goes
3:41 The propane stove that needs shore power
4:49 12V loads: lights and the macerating toilet
5:32 Install bay: where the batteries and inverters go
6:45 The factory inverter loop problem
8:08 50 amp panel quirk: everything on one leg
9:47 Hydraulic jacks, slides and other 12V motors
10:54 Module 1: heavy 12V DC loads
12:06 24V system, 2 batteries, more solar
13:01 Single vs. dual inverter bundles
14:14 What the engineering consult changed
14:55 Why "one and a half big loads" isn't real
16:46 The pick: Pro bundle
16:59 Solar survey: four 250W panels
19:25 Build summary
19:35 Dual inverters in parallel, explained
20:45 What if you have an onboard generator?
21:51 Next up: the pre-ship validation call










