Another full day, but good to have all the wiring completed for the generator’s arrival! The generator disconnect, auxiliary circuits in the garage, and basement sub-panel went in without a hitch, but we weren’t so lucky everywhere else…

So where were the hitches that had us working late into the evening? Firstly, our home runs to all of the house circuits were stripped _just barely_ outside of the new panel location, which required heat shrinking for each wire. This required a materials run and some tedious wire-by-wire TLC. Secondly, the electric range had a bad termination in the receptacle box which tripped the breaker as we were cycling up. Thankfully, given it is on a dedicated circuit, troubleshooting was fairly quick and painless.

This project with Tom has been a blast, and reminds us of the value of having a company culture that attracts customers like him! If you’d like to be our next happy customer and/or collaborator, please check the links below.

As always, if this video is unclear or skew to what you are searching for, feel free to comment below for additional assistance.

EPRO-2-Call:
You’ve got the tools and the willingness to solve your own electrical problem, but are held up by a couple ominous details. Rather than hiring out the whole project, get EPro’s own Joel Walsman on a video or voice call here: https://electric-pro-academy.square.site/

Products We’d Recommend:
*EPRO endorses pro-level tools & materials, and receives a small commission for purchases through our links from Amazon & other affiliate programs. We’d be happy to recommend more cost-effective products for DIYers and low-frequency users if you engage with us in the comment section!
[] EPRO’s Amazon Storefront: amazon.com/shop/electricproacademy

2020 National Electrical Code (NEC) referenced in this video:
Free Access Here: link.nfpa.org/free-access/publications/70/2020
[] Attic Raceway [NEC 300.4(D)(1)]
[] Feeder Conductor Sizing Table [NEC Table 310.16]
[] Acceptable Disconnecting Means (Service, Feeders, Motors, etc.) [NEC 230.70, 430, 440, etc.]

Outline:
0:00 - Introduction
0:32 - Utility Reconnect
3:55 - Attic Raceways
5:44 - Prepping Main Panel for Landing Circuits
8:47 - Installing the Generator Disconnect
13:04 - Basement Sub-Panel Finish-Out
14:31 - Terminating the Main Panels
19:20 - Testing the ATS
23:38 - Testing Main Panel & Garage Heater
25:06 - Testing Basement Sub-Panel
25:54 - Installing & Terminating Surge Protector
27:33 - Final Testing
28:19 - Final Eval from Tom

Connect With Us:
Electric Pro Academy is a multimedia team dedicated to training and instructing DIYers and professional electricians for the growth and dignity of the craft nationwide.
instagram.com/ElectricProAcademy
facebook.com/ElectricProAcademy
odysee.com/@ElectricPro

Jefferson Electric installs and services residential, commercial, solar, and Tesla systems in Indianapolis, IN.
jeffersonelectricllc.com
facebook.com/JeffersonElectric
linkedin.com/company/jefferson-electric-llc

Got a question or ideas for a future video? Leave a comment below and submit your idea here: forms.clickup.com/f/23xa9-70/MU8E4HBGPNY3NXVQA3

Thank you for watching; we value your feedback and monitor this channel daily.
Now All We Needs a Generator...Were Coming to Vegas!Control EVERY Light From EVERY SwitchPortable batteries ARENT just for camping!Why is there a rainbow of flags in my yard?!The MOST DIFFICULT Solar Installation Weve Had Yet - Part 2Interview with Stud Pack: Part 1 - PaulHow difficult is it to install a smart electrical panel?The Best Smart Sub-Panel Weve Ever InstalledWhys there a button on the side of my house?Fixing the Batteries in an Award Winning HomeOur BIGGEST Electrical Project EVER - Part 2
Electric Pro Academy |

Now All We Need's a Generator...

SHARE TO X SHARE TO REDDIT SHARE TO FACEBOOK WALLPAPER