Uploaded February 2026 | Updated September 2026, 4 days ago
In this installment of the world's slowest layout build we start work on the area that has the most complex track work. On the lower level the double tracks split with two lines running into a tunnel and two lines continuing on to form a loop around the top of the helix area. This requires two points and a diamond crossing. I also try out DCC Concepts Cobalt IP Digital point motors for the first time.
Affiliate links:
Bosch Multi tool (amzn.to/405GcQc)
Cobalt IP Digital Point Motors (railsofsheffield.com/products/dcc-concepts-dcp-cb12dip-cobalt-ip-digital-point-motor-12-pack?_pos=2&_sid=5d1925742&_ss=r&ref=LITTLEWICKET)
Support the channel by becoming a member or Patron:
youtube.com/channel/UCjSL9gh-CP9cL2grTM4VRCQ/join
patreon.com/LittleWicketRailway
00:00 Update
00:49 Mapping from AnyRail
01:34 Station Area
02:43 More progress
03:30 Installing Double Track Junction
08:57 Cobalt IP Digital Point Motor
11:48 Testing
In this installment of the world's slowest layout build we start work on the area that has the most complex track work. On the lower level the double tracks split with two lines running into a tunnel and two lines continuing on to form a loop around the top of the helix area. This requires two points and a diamond crossing. I also try out DCC Concepts Cobalt IP Digital point motors for the first time.
Affiliate links:
Bosch Multi tool (amzn.to/405GcQc)
Cobalt IP Digital Point Motors (railsofsheffield.com/products/dcc-concepts-dcp-cb12dip-cobalt-ip-digital-point-motor-12-pack?_pos=2&_sid=5d1925742&_ss=r&ref=LITTLEWICKET)
Support the channel by becoming a member or Patron:
youtube.com/channel/UCjSL9gh-CP9cL2grTM4VRCQ/join
patreon.com/LittleWicketRailway
00:00 Update
00:49 Mapping from AnyRail
01:34 Station Area
02:43 More progress
03:30 Installing Double Track Junction
08:57 Cobalt IP Digital Point Motor
11:48 Testing