Uploaded December 2023 | Updated September 2026, 2 weeks ago
A day in the life at the VIPER clean room with Juan Barragan.
Meet VIPER’s Cross-Cutting Integration Manager, Juan Barragan, who oversees the rover’s assembly and leads both strategic and tactical planning.
NASA’s first robotic lunar rover, VIPER, is being built at NASA’s Johnson Space Center in Houston, (@NASAJohnson). The rover will embark on a mission to the lunar South Pole to trek into permanently shadowed areas and unravel the mysteries of the Moon’s water.
Video credit: NASA/Erica Hangasky
Learn more: science.nasa.gov/mission/viper
#NASA #AmesResearchCenter #NASAJohnson #MoonRover #Moon #Mission #Rover
A day in the life at the VIPER clean room with Juan Barragan.
Meet VIPER’s Cross-Cutting Integration Manager, Juan Barragan, who oversees the rover’s assembly and leads both strategic and tactical planning.
NASA’s first robotic lunar rover, VIPER, is being built at NASA’s Johnson Space Center in Houston, (@NASAJohnson). The rover will embark on a mission to the lunar South Pole to trek into permanently shadowed areas and unravel the mysteries of the Moon’s water.
Video credit: NASA/Erica Hangasky
Learn more: science.nasa.gov/mission/viper
#NASA #AmesResearchCenter #NASAJohnson #MoonRover #Moon #Mission #Rover










