Uploaded November 2021 | Updated November 2026, 2 days ago
WASHINGTON — NASA aims to send three new types of robots to the moon by the end of next year, including the first drill to ever mine material from the moon. Here are the details:
NASA recently announced that it will send the first robotic drill to the moon by the end of next year, and that the drill site will be on a ridge near the moon’s south pole, called the Shackleton connecting ridge.
The plan is to send a moon lander equipped with a special drill robot, a flying drone, and a wheeled drone that will test the moon’s first 4G base station, which will also be housed in the lander.
The drill unit will stay attached to the lander, drilling a hole of up to a meter deep, while a mass spectrometer analyzes all the soil and gas particles that the drill brings up to the surface.
The main aim of the mission is to find water ice in the moon soil, as such a find would greatly boost the sustainability of any future moon base.
One problem is that water ice cannot exist in the uppermost meter of the moon’s soil if it receives too much heat from direct sunlight, so the site was selected to be cool enough to preserve water ice while still receiving enough sunlight to power the drill for ten days.
Meanwhile, the flying drone will gather surface data while the wheeled drone will test the 4G network.
NASA says deploying and testing these types of technologies is critical to establishing a robust, long-term presence in deep space, and to prepare for NASA’s upcoming Artemis missions to the moon.
SOURCES: NASA, Phys.org
nasa.gov/feature/nasa-intuitive-machines-announce-landing-site-location-for-lunar-drill
phys.org/news/2021-11-nasa-intuitive-machines-site-lunar.html
WASHINGTON — NASA aims to send three new types of robots to the moon by the end of next year, including the first drill to ever mine material from the moon. Here are the details:
NASA recently announced that it will send the first robotic drill to the moon by the end of next year, and that the drill site will be on a ridge near the moon’s south pole, called the Shackleton connecting ridge.
The plan is to send a moon lander equipped with a special drill robot, a flying drone, and a wheeled drone that will test the moon’s first 4G base station, which will also be housed in the lander.
The drill unit will stay attached to the lander, drilling a hole of up to a meter deep, while a mass spectrometer analyzes all the soil and gas particles that the drill brings up to the surface.
The main aim of the mission is to find water ice in the moon soil, as such a find would greatly boost the sustainability of any future moon base.
One problem is that water ice cannot exist in the uppermost meter of the moon’s soil if it receives too much heat from direct sunlight, so the site was selected to be cool enough to preserve water ice while still receiving enough sunlight to power the drill for ten days.
Meanwhile, the flying drone will gather surface data while the wheeled drone will test the 4G network.
NASA says deploying and testing these types of technologies is critical to establishing a robust, long-term presence in deep space, and to prepare for NASA’s upcoming Artemis missions to the moon.
SOURCES: NASA, Phys.org
nasa.gov/feature/nasa-intuitive-machines-announce-landing-site-location-for-lunar-drill
phys.org/news/2021-11-nasa-intuitive-machines-site-lunar.html










