Mudroom Renovation Part 7: Guts and Bolts @BenTardif
Mudroom Renovation Part 7: Guts and Bolts  @BenTardif
Uploaded September 2022 | Updated November 2026, 3 hours ago
In this video, I overhauled the entire plumbing and water system for the new layout of the mudroom. This includes and entirely new sewer line layout with an air admittance valve, proper valves for the water line, and a new exhaust for the dryer. The sewer and water lines were also set up to run to the sink when that is eventually installed. In addition to the renovation elements, I also used a mainline drain cleaner to remove nasty buildup inside the existing drain pipe.

Etsy Shop: etsy.com/shop/TheBenCompany
Check out my website: thebencompany.com
Patreon (exclusive and advance content): patreon.com/bentardif
Instagram (current updates): instagram.com/bentardif
Tools I use: amazon.com/shop/bentardif

Music by: David Cutter Music - davidcuttermusic.com
Mudroom Renovation Part 7: Guts and BoltsSki Jump Marble Machine Build, Part 1High Flying Domino Masters Act!Cluckingham Palace Part 2, Chicken Coop for the SoulMudroom Renovation Part 3: Step It UpCan you name these 12 Bridges? Marble Machine BuildSuper Organized Custom Paint Cabinet5 Best Topples - So SatisfyingBig Loop Marble Machine Build, Part 2Mudroom Renovation Part 19 - Turf WarsChannel Update! House Reno in Full SwingHow I Made a Chain Reaction Scoreboard
Ben Tardif |

Mudroom Renovation Part 7: Guts and Bolts

SHARE TO X SHARE TO REDDIT SHARE TO FACEBOOK WALLPAPER