Moving the RPV lid from R4 in Fukushima Daiichi @hilbert00
Moving the RPV lid from R4 in Fukushima Daiichi  @hilbert00
Uploaded September 2012 | Updated November 2026, 3 hours ago
This video shows the procedure followed to remove from the operational floor of reactor number 4 the RPV lid.

Other internal structures will be removed in the following days in order to free more space in the reactor well pool and continue with the operations for the spent fuel removal.
Moving the RPV lid from R4 in Fukushima DaiichiInspection in the TIP room of reactor 2 of Fukushima DaiichiEstimation of new emissions (1/2)Quince 2 exploration of TIP room in reactor 3Opening reactor 4 at Fukushima DainiPresent state of radiation levels within the Fukushima NPPRoute of the south side in the torus room (heat insulator)Images from underwater pool 3Underwater images from SFP 3Visiting 6th floor of unit 1 in Dainiwater flood on Unit 6 condensed water demineraliser regenerator room (4)Transparency test in fuel pool of reactor 4
Antonio Bulgheroni (toto) |

Moving the RPV lid from R4 in Fukushima Daiichi

SHARE TO X SHARE TO REDDIT SHARE TO FACEBOOK WALLPAPER