Maximum efficiency in tunnel construction - Progress Software Development @progress-group
Maximum efficiency in tunnel construction - Progress Software Development  @progress-group
Uploaded March 2025 | Updated November 2026, 3 hours ago
Thanks to the innovative, highly automated production of static meshes using Building Information Modeling (BIM) with Progress software solutions, the entire process (design, planning, production and construction) in the area of steel processing could be optimized. The digital twin of the project in Autodesk Revit enabled the seamless export of data to the ERP & MES system using the in-house plug-in Model2Fabrication. This allowed all subsequent process phases to be planned, implemented and controlled in a precise, cost- and time-efficient manner. Especially the producibility check (PTS) in Model2Fabrication ensured that producibility was already guaranteed in the design process. This resulted in significant savings of material, labor, time, costs and CO2 emissions.
Maximum efficiency in tunnel construction - Progress Software DevelopmentTilting Table - Tecnocom๐—ฌ๐—ผ๐˜‚๐—ฟ ๐˜„๐—ฎ๐˜† ๐˜๐—ผ ๐—ฃ๐—ฅ๐—ข๐—š๐—ฅ๐—˜๐—ฆ๐—ฆ.Building the future โ€“ Andrรฉ Menge on the digital transformationBuilding the future โ€“ Ulrich Rekers on digitalization & automationBuilding the future โ€“ Tim Grooteman on digitalization & automationGreen Code Precast Days 2024South Tyrol is building with concrete - Progress AGBuilding the future โ€“ Erwin Rauch on building sustainably with automation and digitalizationMulti- rotor straightening machine MSR 25 - Progress Maschinen & AutomationPROGRESS GROUP | Automation - Digitalization - Building SystemsGBS Prefab: Bulgarias Most Advanced Precast Plant โ€“ Tecnocom
PROGRESS GROUP |

Maximum efficiency in tunnel construction - Progress Software Development

SHARE TO X SHARE TO REDDIT SHARE TO FACEBOOK WALLPAPER