Tracking construction progress in complex and hard-to-reach areas can be challenging.
On this data center project, monitoring the installation of drainage pipes was particularly difficult due to the heavy machinery preparing foundations for 48 generators - critical to powering the future facility.
Using engineering grade augmented reality™ (AR) and leveraging an elevated vantage point from a nearby rooftop, we successfully documented the progress. ✅
A smart and efficient solution!
#datacenter #datacentre #construction
Tracking construction progress in complex and hard-to-reach areas can be challenging.
On this data center project, monitoring the installation of drainage pipes was particularly difficult due to the heavy machinery preparing foundations for 48 generators - critical to powering the future facility.
Using engineering grade augmented reality™ (AR) and leveraging an elevated vantage point from a nearby rooftop, we successfully documented the progress. ✅
A smart and efficient solution!
#datacenter #datacentre #construction