Mantis™ Stands Tall | First Arm Installed @FBR-ltd
Mantis™ Stands Tall | First Arm Installed  @FBR-ltd
Uploaded June 2026 | Updated November 2026, 5 days ago
Join FBR CEO Mark Pivac for the latest progress update on Mantis™, FBR's advanced robotic welding platform currently under development.

In this update, the first arm has been assembled onto the tower, providing the first real glimpse of the scale of the completed robot. The team is now progressing through trial assembly, fitment verification and preparations for dynamic testing.

Mark also takes viewers behind the scenes to showcase key components including the shoulder joint, precision bearing reducers, servo motors, electrical systems, wrist assemblies and the innovative base system that enables rapid deployment.

With the second arm still to be installed, Mantis™ continues to move closer toward full assembly and testing.

In this video:
• First arm installed onto the tower
• Trial assembly and fitment testing
• Dynamic testing preparation
• Precision bearing reducers and servo motors
• Electrical systems and controls
• Mantis™ wrist assembly
• Rapid deployment base design
• What's next for Mantis™

Subscribe for future updates as FBR continues developing advanced robotics and automation solutions for construction, manufacturing and heavy industry.

#FBR #Mantis #Robotics #Automation #engineering

Website: https://www.fbr.com.au
LinkedIn: linkedin.com/company/fbr-ltd
YouTube: youtube.com/c/FBR-ltd
Instagram: instagram.com/fbr_ltd
Facebook: facebook.com/FBR.ltd

(C) Copyright 2026 FBR Limited
Mantis™ Stands Tall | First Arm InstalledHadrian X® Completes Two Storey Structure | FBR🚀 From Construction to Defence: DST® Groundbreaking Robotic Stabilisation Technology from FBRMantis™ Reaches Final Form: Twin-Wire High-Deposition WeldingFBR signs MOU with United Arab Emirates Ministry of Energy & Infrastructure | FBRBuilding progress! 🏡✨ | FBRHadrian® Sets New Construction Robot Speed Record | Raw Unedited Build FootageRobotic welding made simple | Mantis™ by FBRRevolutionizing Construction in Florida: Meet Hadrian X® | FBRMantis™ Goes to Work: Proving Economic Viability 💪First five homes in U.S. Demonstration Program Completed | FBRFBR completes outdoor pilot build for Wienerberger | FBR
FBR |

Mantis™ Stands Tall | First Arm Installed

SHARE TO X SHARE TO REDDIT SHARE TO FACEBOOK WALLPAPER