Uploaded June 2020 | Updated September 2026, 1 week ago
MacArthur returns to the Philippines
Army Gen. Douglas MacArthur fulfilled his pledge to the Filipino people and returned to the Philippines.
Video courtesy of U.S. Department of Defense
us army,
general macarthur,
general macarthur philippines,
general macarthur samar,
macarthur park,
macarthur i shall return,
macarthur race pigeon,
general macarthur speech,
general macarthur death,
general macarthur movie,
general macarthur eastern samar province philippines,
general macarthur son,
general macarthur korean war,
general macarthur story,
general macarthur documentary,
general macarthur funeral grave,
general macarthur and emperor hirohito,
general macarthur give me 10000 filipinos,
Give me ten thousand Filipinos and I shall conquer the world,
MacArthur returns to the Philippines
Army Gen. Douglas MacArthur fulfilled his pledge to the Filipino people and returned to the Philippines.
Video courtesy of U.S. Department of Defense
us army,
general macarthur,
general macarthur philippines,
general macarthur samar,
macarthur park,
macarthur i shall return,
macarthur race pigeon,
general macarthur speech,
general macarthur death,
general macarthur movie,
general macarthur eastern samar province philippines,
general macarthur son,
general macarthur korean war,
general macarthur story,
general macarthur documentary,
general macarthur funeral grave,
general macarthur and emperor hirohito,
general macarthur give me 10000 filipinos,
Give me ten thousand Filipinos and I shall conquer the world,


![Philippine Navy ScanEagle UAV
Philippine Navy ScanEagle UAV
On November 25, during the turnover, acceptance and blessing ceremony, at Heracleo Alano Naval Base in Cavite, Phil Navy vice admiral Giovanni Carlo Bacordo received the ScanEagle Unmanned Aerial System (UAS) from the US through acting deputy chief of Mission Kimberly Kelly and Representatives from the US Embassy in the Philippines’ Joint U.S. Military Assistance Group (JUSMAG).
According to the U.S. embassy, the newly turned-over system which costs 710 Million pesos, will provide and increase intelligence, surveillance, and reconnaissance (ISR) capabilities to the 71st Maritime Unmanned Aerial Reconnaissance Squadron (71 MUARS) of the Philippine Fleet’s Naval Air Wing.
Sources & Attributions
1. U.S. Embassy in the Philippines. (2020, November 25). U.S. Embassy Acting Deputy Chief of Mission Kimberly Kelly turns over a ScanEagle Unmanned Aerial System to the Flag Officer in Command, Philippine Navy, Vice Admiral Giovanni Carlo Bacordo, at Naval Base Heracleo Alano [Photograph]. Ph.Usembassy.Gov. https://bit.ly/3l6DH9v
2. Philippine Navy. (2020, November 25). [ScanEagle UAS]. Twitter. https://bit.ly/2KHXgsc
3. Philippine Navy. (2020, November 25). [ScanEagle UAS]. Twitter. https://bit.ly/3l10vaE
4. Insitu. (n.d.). Insitu [Illustration]. Insitu.Com. https://bit.ly/2V0hdfG
5. Mass Communication Specialist Seaman Patrick W. Mullen III, Public domain, via Wikimedia Commons. https://bit.ly/2KzkJeY
6. U.S. Navy photo /Released, Public domain, via Wikimedia Commons. https://bit.ly/2Jb4swi Philippine Navy ScanEagle UAV](https://i.ytimg.com/vi/icQy_7EIsZI/mqdefault.jpg)






![PNR CLARK PHASE 1 | 38-kilometer mass railway transport
PNR CLARK PHASE 1 | 38-kilometer mass railway transport
This 38-kilometer mass railway transport, which forms part of the mega railway network, the North-South Commuter Railway (NSCR) Project, now stands at 39.70% completion rate as of July 2020.
Even amid the current pandemic, the construction work for the project continues to make strides, such as the construction for the temporary access roads, temporary bridge construction, temporary facility, as well as the bored piling works, structural excavation works, and fabrication of precast segment for the project.
To recall, the project was originally conceptualized in the 1990s, but due to disagreements on funding and a host of other issues, the project has been put at the back burner.
It is only during the Administration of President Rodrigo Roa Duterte, and under the leadership of DOTr Secretary Arthur P. Tugade that the project has been made a priority. BUILD BUILD BUILD.
Now, it is almost halfway through completion.
Once fully operational, PNR Clark Phase 1, which will connect Tutuban, Manila to Malolos, Bulacan, will cut down travel time to just 35 minutes, from the present one (1) hour and 30 minutes by land.
The rail line is expected to serve 300,000 passengers daily.
Through this video, taken in February 2020 (before the COVID-19 pandemic), we take you on a tour of the progress of PNR Clark Phase 1!
We do not own this video.
[Video Courtesy: SMCC through DOTr] PNR CLARK PHASE 1 | 38-kilometer mass railway transport](https://i.ytimg.com/vi/m_yZOJyE9Jc/mqdefault.jpg)
