Liebherr LTM 1450 8.1 Old railway bridge demolition @ConstructionWorldXiuMeiHe
Liebherr LTM 1450 8.1 Old railway bridge demolition  @ConstructionWorldXiuMeiHe
Uploaded May 2024 | Updated November 2026, 2 hours ago
Background - information is available here:
waz.de/staedte/herne-wanne-eickel/article242327022/Brueckenabriss-fuehrt-zu-Vollsperrung-auf-A43-in-Herne.html
The company Bracht (bracht-autokrane.de/) is crane-lifting the old railway bridge. The bridge was divided into 2 segments, one weighing around 60 tonnes and one weighing around 150 tonnes. The smaller segment is crane-lifted by the LTM 1450, LTM 1450 and LTM 1650 then do the tandem lift to place the bridge segment on the road. The parts are dismantled by teams of 6 welders.

All my videos ➤ youtube.com/user/Fuximux/videos

#Fuximux
#ConstructionWorldXiuMeiHe
Liebherr LTM 1450 8.1 Old railway bridge demolitionExcavator  CAT 326 F - demolition site (day #10 Video #1)Demolition site Stern-Verlag CAT 352Hitachi Zaxis 300 LCNLiebherr LTM 1450 crane Dismantling of tower craneExcavator CAT 340 - demolition siteExcavator CAT 385 B  - longfront demolition siteExcavator CAT 326 F - demolition site
Construction World |

Liebherr LTM 1450 8.1 Old railway bridge demolition

SHARE TO X SHARE TO REDDIT SHARE TO FACEBOOK WALLPAPER