Uploaded April 2025 | Updated November 2026, 3 hours ago
Learn how to install and commission the new LG High-Voltage Batteries with a Growatt Inverter in this detailed, step-by-step video. Alex and Kelly from Signature Solar walk you through the entire process from wiring and battery configuration to final commissioning and testing.
This tutorial is designed for both DIY solar enthusiasts and professional solar installers who want a clear and reliable guide to integrating LG HV batteries with Growatt hybrid inverters.
Product Links:
LG HV Battery and Growatt Grid-Tie Inverter Bundle: signaturesolar.com/lg-high-voltage-battery-bundle-with-growatt-inverter
Subscribe to the channel for more solar installation tutorials, product overviews, and in-depth tech guidance from the Signature Solar team.
Have questions or feedback? Let us know in the comments below.
0:00 - Intro
0:56 - Connecting MIN 11.4kW to the SYN
7:16 - SYN to Critical Load Panel
7:57 - Setting Up Communications
10:10 - LG Prime to 11.4 Inverter
12:38 - Secondary Battery Setup
16:18 - Finalizing Comms with LG Prime
20:00 - Rapid Shutdown
23:51 - Darkstart
25:30 - WiFi & Cellular
26:17 - Connecting Battery Conductors
27:49 - Connecting Grid to SYN
28:43 - Breaker Lockout Kit
29:53 - Connecting Grid Conductors
30:55 - Continuity Testing
33:01 - Powering On
34:03 - Determining Loads
35:25 - Turning On Breakers
35:44 - Computer Commissioning
40:11 - Mobile Commissioning w ShineTools
45:20 - Load Testing w the Shiner App
53:14 - Outro & More Info
Learn how to install and commission the new LG High-Voltage Batteries with a Growatt Inverter in this detailed, step-by-step video. Alex and Kelly from Signature Solar walk you through the entire process from wiring and battery configuration to final commissioning and testing.
This tutorial is designed for both DIY solar enthusiasts and professional solar installers who want a clear and reliable guide to integrating LG HV batteries with Growatt hybrid inverters.
Product Links:
LG HV Battery and Growatt Grid-Tie Inverter Bundle: signaturesolar.com/lg-high-voltage-battery-bundle-with-growatt-inverter
Subscribe to the channel for more solar installation tutorials, product overviews, and in-depth tech guidance from the Signature Solar team.
Have questions or feedback? Let us know in the comments below.
0:00 - Intro
0:56 - Connecting MIN 11.4kW to the SYN
7:16 - SYN to Critical Load Panel
7:57 - Setting Up Communications
10:10 - LG Prime to 11.4 Inverter
12:38 - Secondary Battery Setup
16:18 - Finalizing Comms with LG Prime
20:00 - Rapid Shutdown
23:51 - Darkstart
25:30 - WiFi & Cellular
26:17 - Connecting Battery Conductors
27:49 - Connecting Grid to SYN
28:43 - Breaker Lockout Kit
29:53 - Connecting Grid Conductors
30:55 - Continuity Testing
33:01 - Powering On
34:03 - Determining Loads
35:25 - Turning On Breakers
35:44 - Computer Commissioning
40:11 - Mobile Commissioning w ShineTools
45:20 - Load Testing w the Shiner App
53:14 - Outro & More Info










