Uploaded August 2020 | Updated November 2026, 1 day ago
The first activation is shown at 3:40
This is the Macquarie Street level crossing at Taree, New South Wales. In mid 2017 the original gated signals with their Harmon gate mechanisms were replaced by new signals with Siemens gate mechanisms. The Harmon median signals were retained and fitted with new red background crossbucks. The old signals can be seen here in the first video from May 2017 youtube.com/watch?v=2mZGtUNtSGE
Both new gated signals have Western Cullen Hayes bases and United Group LED lights. The lights on the northern signal are mounted on a Western Cullen Hayes crossarm, while the lights on the southern signal are mounted on a United Group crossarm. The northern signal has a Siemens electronic bell and the southern signal has a Western Cullen Hayes electronic bell which was dead at the time of filming. The bells are connected to a timer which automatically switches them off between 10pm and 7am.
These were possibly the last Siemens gate mechanisms installed in New South Wales, as approval for their use in new installations had only been withdrawn a couple of months previously in April 2017 due to ongoing technical issues. The only reason the Siemens mechanisms were installed here is because they had already been purchased prior to approval being withdrawn.
Train information:
1st train: 5BS6 freight from Brisbane to Sydney, with locomotives NR87 and LDP9.
2nd train: 6422 empty cement from Grafton to Newcastle (Morandoo), with locomotives 8250, 8257 and 48123.
Filmed on June 5, 2020.
The first activation is shown at 3:40
This is the Macquarie Street level crossing at Taree, New South Wales. In mid 2017 the original gated signals with their Harmon gate mechanisms were replaced by new signals with Siemens gate mechanisms. The Harmon median signals were retained and fitted with new red background crossbucks. The old signals can be seen here in the first video from May 2017 youtube.com/watch?v=2mZGtUNtSGE
Both new gated signals have Western Cullen Hayes bases and United Group LED lights. The lights on the northern signal are mounted on a Western Cullen Hayes crossarm, while the lights on the southern signal are mounted on a United Group crossarm. The northern signal has a Siemens electronic bell and the southern signal has a Western Cullen Hayes electronic bell which was dead at the time of filming. The bells are connected to a timer which automatically switches them off between 10pm and 7am.
These were possibly the last Siemens gate mechanisms installed in New South Wales, as approval for their use in new installations had only been withdrawn a couple of months previously in April 2017 due to ongoing technical issues. The only reason the Siemens mechanisms were installed here is because they had already been purchased prior to approval being withdrawn.
Train information:
1st train: 5BS6 freight from Brisbane to Sydney, with locomotives NR87 and LDP9.
2nd train: 6422 empty cement from Grafton to Newcastle (Morandoo), with locomotives 8250, 8257 and 48123.
Filmed on June 5, 2020.