✅ Level 2 International Terminals Arrivals Hall refresh project @brisbaneairport
✅ Level 2 International Terminals Arrivals Hall refresh project  @brisbaneairport
Uploaded November 2026 | Updated November 2026, 3 hours ago
Our Level 2 Arrivals Hall refresh is now complete, and with it, Ben Trupperbaumer’s original Anchorage & Passage artwork has entered its fourth life at the International Terminal.

Timber reclaimed from the 1995 sculpture, originally commissioned for the opening of our International Terminal, has now been repurposed into the new joinery and design, retaining a piece of the terminal’s history within the refreshed meeting space.

More than three decades on, the story continues in a new form.

Explore the journey of the Anchorage & Passage artwork here: youtu.be/lzdUwuiTr9E
✅ Level 2 International Terminals Arrivals Hall refresh projectConnecting the Arts: Christmas Carols with CamerataAirport Industrial Park - Latest Leasing Opportunity✈️ BNE Travel Inspo ✨ New Zealand“Your Point of View” by Gus Eagleton at Brisbane AirportLifeFlights new home at Brisbane AirportPOV: Travel day at the airport — through assistance dog Casper’s eyes 👀🐾Modinex is turning a reclaimed timber sculpture into timeless design at our International TerminalJobs @ BNE Spotlight: Menzies AviationAramex Official Opening EventWelcome to our WorldBen Trupperbaumer talks about the new life of his sculpture ‘Anchorage & Passage’
Brisbane Airport |

✅ Level 2 International Terminals Arrivals Hall refresh project

SHARE TO X SHARE TO REDDIT SHARE TO FACEBOOK WALLPAPER