Leslie Dan: Installation of the Spray Applied Acoustic Material in the Pod @tboake3000
Leslie Dan: Installation of the Spray Applied Acoustic Material in the Pod  @tboake3000
Uploaded February 2013 | Updated September 2026, 2 weeks ago
Construction of the Leslie Dan School of Pharmacy at the University of Toronto, designed by Foster+Partners. This video shows the installation of the spray acoustic material inside of the suspended pods. As these are used for classroom spaces, the acoustic separation is necessary.
Leslie Dan: Installation of the Spray Applied Acoustic Material in the PodThe Building Envelope: Our Third SkinArch 172: Masonry ConstructionOCAD Interior during constructionArch 172: Soils, Surveying and FoundationsOCAD View down Fire Stairs during ConstructionArchitecturally Exposed Structural Steel - Part 2 - FinishesLeslie Dan: View of the Exterior and Curtain Wall during ConstructionArch 172: Stone from Technique to Technology 2017Iron and Steel: From Technique to TechnologyAE101: History of Masonry ConstructionOCAD Installation of Steel Decking
Terri Boake |

Leslie Dan: Installation of the Spray Applied Acoustic Material in the Pod

SHARE TO X SHARE TO REDDIT SHARE TO FACEBOOK WALLPAPER