Landing the Stack Nozzle: BP Oil Spill Cam @BaguaChannel
Landing the Stack Nozzle: BP Oil Spill Cam  @BaguaChannel
Uploaded August 2010 | Updated September 2026, 3 days ago
A near 5,000 foot Drill Pipe ending in a hydraulic Collet Connector is lowered from the surface, to mate with the nipple ontop of the 3-RAM Sealing Stack. This will be used to flush the BOP and Stack with water to remove oil, gas and mud.

For 48 hours the BOP Stack will sit at ambient pressure to test the well integrety ahead of the BOP removal.
Landing the Stack Nozzle: BP Oil Spill CamBP Oil Spill: ROV Tether Kink Op. Pt. 1BP Oil Spill Cam: Creatures pass byBOP Inspection Top to BottomBP Spill Cam: Long EELBP Oil Spill: Fessels Fish at the well-headFurry Lewis - Kassie JonesDeepwater Horizon BOP secrets Pt. 33-Ram Sealing Stack Erupts: BP Oil Spill Cam
BaguaChannel |

Landing the Stack Nozzle: BP Oil Spill Cam

SHARE TO X SHARE TO REDDIT SHARE TO FACEBOOK WALLPAPER