Uploaded August 2010 | Updated September 2026, 3 days ago
A near 5,000 foot Drill Pipe ending in a hydraulic Collet Connector is lowered from the surface, to mate with the nipple ontop of the 3-RAM Sealing Stack. This will be used to flush the BOP and Stack with water to remove oil, gas and mud.
For 48 hours the BOP Stack will sit at ambient pressure to test the well integrety ahead of the BOP removal.
A near 5,000 foot Drill Pipe ending in a hydraulic Collet Connector is lowered from the surface, to mate with the nipple ontop of the 3-RAM Sealing Stack. This will be used to flush the BOP and Stack with water to remove oil, gas and mud.
For 48 hours the BOP Stack will sit at ambient pressure to test the well integrety ahead of the BOP removal.







