Uploaded July 2026 | Updated September 2026, 2 weeks ago
James M. McDonald, CEO & Director - Kootenay Silver explains why a 14-year mine life is important.
A longer mine life gives the company more time to produce silver, work through startup issues and potentially add more ounces. The project is expected to average 4.5 million ounces of silver per year, with stronger production in the first five years.
#silver #mining #miningstocks #investing #commodities
Follow Darrell on X: https://x.com/MoneyLevelsShow
Follow the VRIC on X: https://x.com/vricmedia
Follow the VRIC on Instagram: instagram.com/vric_media
Learn to invest alongside the top minds in commodities. Join The Commodity University today. CLICK: linkly.link/26yH9
Sign up for Jay’s newsletter at 2ly.link/211gx
Copyright © 2026 Cambridge House International Inc. All rights reserved.
James M. McDonald, CEO & Director - Kootenay Silver explains why a 14-year mine life is important.
A longer mine life gives the company more time to produce silver, work through startup issues and potentially add more ounces. The project is expected to average 4.5 million ounces of silver per year, with stronger production in the first five years.
#silver #mining #miningstocks #investing #commodities
Follow Darrell on X: https://x.com/MoneyLevelsShow
Follow the VRIC on X: https://x.com/vricmedia
Follow the VRIC on Instagram: instagram.com/vric_media
Learn to invest alongside the top minds in commodities. Join The Commodity University today. CLICK: linkly.link/26yH9
Sign up for Jay’s newsletter at 2ly.link/211gx
Copyright © 2026 Cambridge House International Inc. All rights reserved.










