Uploaded December 2024 | Updated September 2026, 2 hours ago
K&L Trainz has joined forces once again with Jointed Rail to bring you another locomotive/route collaboration. Coal Country 2.0 has been released, and what better way to explore the new route than with a new locomotive!
We're proud to present the RP&P's N-2 Class 2-6-6-0 Articulated Compound Mallet #850. Comprised of elements from over a dozen former K&L locomotives, this engine has been designed to tackle the 2.5% grades, as well as negotiate the extremely tight turns found on the new Coal Country 2.0 route.
Follow along as #850 takes 1200 tons over the new trackage of Coal Country 2.0.
Get your copy of #850 at: kltrainz.com
Get your copy of the route at: jointedrail.com
0:00 Intro
0:13 Backing up
1:27 Departing Parker
2:10 Parker Creek
2:53 Clackline
3:45 Lefroy Yard Limits
4:09 Lefroy Power & Light
4:40 South Lefroy
5:12 Bledsoe Tipple
5:32 Peabody Gulch
6:06 Kellerberrin
6:37 Burning Fork
7:23 Shade Gap
8:05 Arriving Richmond
8:20 Richmond Station
9:18 Credits
10:09 Richmond Steel Mill
10:30 East Richmond
10:57 Derby Barge Transloader
11:44 Empty Downhill
K&L Trainz has joined forces once again with Jointed Rail to bring you another locomotive/route collaboration. Coal Country 2.0 has been released, and what better way to explore the new route than with a new locomotive!
We're proud to present the RP&P's N-2 Class 2-6-6-0 Articulated Compound Mallet #850. Comprised of elements from over a dozen former K&L locomotives, this engine has been designed to tackle the 2.5% grades, as well as negotiate the extremely tight turns found on the new Coal Country 2.0 route.
Follow along as #850 takes 1200 tons over the new trackage of Coal Country 2.0.
Get your copy of #850 at: kltrainz.com
Get your copy of the route at: jointedrail.com
0:00 Intro
0:13 Backing up
1:27 Departing Parker
2:10 Parker Creek
2:53 Clackline
3:45 Lefroy Yard Limits
4:09 Lefroy Power & Light
4:40 South Lefroy
5:12 Bledsoe Tipple
5:32 Peabody Gulch
6:06 Kellerberrin
6:37 Burning Fork
7:23 Shade Gap
8:05 Arriving Richmond
8:20 Richmond Station
9:18 Credits
10:09 Richmond Steel Mill
10:30 East Richmond
10:57 Derby Barge Transloader
11:44 Empty Downhill







