Joseph Tests the Repaired Lift at Dunnes – instalation Engineer Andy is Back! @PINKHORSEY
Joseph Tests the Repaired Lift at Dunnes – instalation Engineer Andy is Back!  @PINKHORSEY
Uploaded October 2024 | Updated November 2026, 3 days ago
We called by Dunnes in the city centre today for a catch-up with Ian, the manager.
He shared the good news that Andy, the lift installation engineer is finally back to work after being on long-term sick leave.
Andy checked over the right-side lift, which had been having recurring issues, and after a reset and some repairs, it's now working better than ever!

Ian asked Joseph to test it out and let him know what he thought. Joseph was thrilled to see the lift fixed and even happier to hear that Andy is back on the job.
Joseph Tests the Repaired Lift at Dunnes – instalation Engineer Andy is Back!Na Fianna Force coaster – Off-Ride pov from different angles Joseph rides again!Frances’ POV on Cyclone at Curry’s Portrush - First one of 2026!First Time on Endeavour at Emerald Park! Joseph Loved It, Frances… Not So Much! on ride POVA320 Landing back in Belfast - Gorgeous views on approachPony Rail Ride POV - Kiddies Land at Emerald Park (13/9/24)Riding All 3 Orona Lifts at Viva Sunrise Hotel, Alcudia MallorcaSchindler D Series Lifts at Swords Pavilion filmed 20/9/24Final Ride in the Connswater Lift - KONE EcoDisc (Funny Moment Inside!)First Day of Train Service at Belfast’s New Grand Central Station! 13th October 2024
PINKHORSEY Productions |

Joseph Tests the Repaired Lift at Dunnes – instalation Engineer Andy is Back!

SHARE TO X SHARE TO REDDIT SHARE TO FACEBOOK WALLPAPER