Uploaded October 2024 | Updated September 2026, 1 week ago
In today's video we finally finish off my massive home network install! We'll terminate all the patch panels, build out the rack and finally get the network fully up and running!
Buy on Amazon (Affiliate):
- Cable Crimp Tool & Terminals: geni.us/JSBvIZ
- Labgear TV Distribution Amplifier: geni.us/AZIY3A
- F-Connector Crimp Tool & Connector Set: geni.us/6NYmjqA
- Brother PT-E550W Label Printer: geni.us/BzOiME
Other Products:
- Horizontal Rack Bonding Busbar: uk-store.netceed.com/horizontal-earth-bar-4x-4mm-x-400mm-long-leads-10x-grounding-points-includes-m6-fixings-ln-dgr-tpr-1u10-bl-h-1u-x-w-19.html
Shielded Cable Bonding Technical Document: web.archive.org/web/20240730063157/https://network-data-cabling.co.uk/wp-content/uploads/2020/01/Earthing-Bonding.pdf
camerongray.me
twitter.com/camerongray1515
Chapters:
00:00 - Introduction
00:43 - Work Since Previous Video
03:08 - Installing Bonding Infrastructure
12:13 - Installing CAT 6A Patch Panels
21:23 - Installing speakON Speaker Patch Panel
25:21 - Installing TV Antenna Distribution System
30:19 - Installing Networking Equipment
32:28 - First Switch On!
33:14 - Completed Rack Walkthrough
42:06 - Working Network Faceplate!
43:33 - Conclusion
*AFFILIATE LINKS NOTICE:*
Product links under this video marked “(Affiliate)” are affiliate links where I may receive a small commission on qualifying sales. Affiliate programs that I am a member of include, _but are not limited to:_ Amazon Associates, eBay Partner Network and AliExpress Affiliates.
As an Amazon Associate I earn from qualifying purchases.
Purchasing through these affiliate links will not cost you any more money, however the commission earned significantly helps fund the production of videos on my channel.
In today's video we finally finish off my massive home network install! We'll terminate all the patch panels, build out the rack and finally get the network fully up and running!
Buy on Amazon (Affiliate):
- Cable Crimp Tool & Terminals: geni.us/JSBvIZ
- Labgear TV Distribution Amplifier: geni.us/AZIY3A
- F-Connector Crimp Tool & Connector Set: geni.us/6NYmjqA
- Brother PT-E550W Label Printer: geni.us/BzOiME
Other Products:
- Horizontal Rack Bonding Busbar: uk-store.netceed.com/horizontal-earth-bar-4x-4mm-x-400mm-long-leads-10x-grounding-points-includes-m6-fixings-ln-dgr-tpr-1u10-bl-h-1u-x-w-19.html
Shielded Cable Bonding Technical Document: web.archive.org/web/20240730063157/https://network-data-cabling.co.uk/wp-content/uploads/2020/01/Earthing-Bonding.pdf
camerongray.me
twitter.com/camerongray1515
Chapters:
00:00 - Introduction
00:43 - Work Since Previous Video
03:08 - Installing Bonding Infrastructure
12:13 - Installing CAT 6A Patch Panels
21:23 - Installing speakON Speaker Patch Panel
25:21 - Installing TV Antenna Distribution System
30:19 - Installing Networking Equipment
32:28 - First Switch On!
33:14 - Completed Rack Walkthrough
42:06 - Working Network Faceplate!
43:33 - Conclusion
*AFFILIATE LINKS NOTICE:*
Product links under this video marked “(Affiliate)” are affiliate links where I may receive a small commission on qualifying sales. Affiliate programs that I am a member of include, _but are not limited to:_ Amazon Associates, eBay Partner Network and AliExpress Affiliates.
As an Amazon Associate I earn from qualifying purchases.
Purchasing through these affiliate links will not cost you any more money, however the commission earned significantly helps fund the production of videos on my channel.










