James Hinks is a home builder in Chilliwack, BC. This is his first ICF foundation which was installed by SED Construction Ltd.
Construction of the walls began at 8:00 AM. By the end of the day the foundation, including bracing, was substantially complete. The next day the concrete pour began at 1:00 PM, with the 45 meters being poured in three and one half hours.
The foundation has 271 lineal feet of wall, with a maximum wall height of 14'-3". Surface area of the walls is 2,352 square feet including 15 corners and numerous openings.
Zont bracing was used to align the Nudura ICF walls
fab-form.com/zontBracing/zontBracingOverview.php
James Hinks is a home builder in Chilliwack, BC. This is his first ICF foundation which was installed by SED Construction Ltd.
Construction of the walls began at 8:00 AM. By the end of the day the foundation, including bracing, was substantially complete. The next day the concrete pour began at 1:00 PM, with the 45 meters being poured in three and one half hours.
The foundation has 271 lineal feet of wall, with a maximum wall height of 14'-3". Surface area of the walls is 2,352 square feet including 15 corners and numerous openings.
Zont bracing was used to align the Nudura ICF walls