James Hinks is a home builder in Chilliwack, BC. This is his first ICF foundation which was installed by SED Construction Ltd.
Construction of the walls began at 8:00 AM. By the end of the day the foundation, including bracing, was substantially complete. The next day the concrete pour began at 1:00 PM, with the 45 meters being poured in three and one half hours.
The foundation has 271 lineal feet of wall, with a maximum wall height of 14'-3". Surface area of the walls is 2,352 square feet including 15 corners and numerous openings.
Zont bracing was used to align the Nudura ICF walls
Insulated Concrete Form (ICF) Time Lapse - Zont™ ICF BracingHorizontal Bracing InstallationCut the Overtime with Fastfoot Footings #shorts12 Kickers Off Just 3 Stakes: Smart Zont Bracing Hack #Shorts #diyFast-Tube™ Concrete Column Form InstallationICF Monopour MinuteDoorbucks with Fastfoot® MonopourHow to Brace ICF Walls | Zeveler™ ICF height adjustment bracketLearning the Limits of Fabric Forming #shorts
Fab-Form Industries |

Insulated Concrete Form (ICF) Time Lapse - Zont™ ICF Bracing

SHARE TO X SHARE TO REDDIT SHARE TO FACEBOOK WALLPAPER