Installing a 2,000 tonne headframe in just HOURS @MammoetHeavyLifting
Installing a 2,000 tonne headframe in just HOURS  @MammoetHeavyLifting
Uploaded April 2026 | Updated November 2026, 5 hours ago
Mammoet has supported @ledcor with the construction of @bhp's new Jansen potash mine, which is planned to begin production in 2027. It will become one of the largest potash mines in the world and is estimated to produce approximately 8.5 million tonnes per annum when it is fully operational.

The key scope for Mammoet was to remove the lower section of an existing headframe unit and replace it with a larger one, to increase mining capacity. This approach – enabled by Mammoet’s heavy lifting and transport expertise - limited the amount of construction equipment and operators on site and allowed parts of both components to be built in parallel, shortening the project schedule relative to other methods.

Read the case study: mmoet.me/48aYkwn

#mammoet #mining #canada
Installing a 2,000 tonne headframe in just HOURSJust time for a quick look back...Collaborating with Maersk Project Logistics and...Our team loaded out this huge 33,000t structure...Mammoet Moment of 2025: Dogger Bank CHolland Hydrogen 1 Timelapse #1Mammoet Moment of 2025: Highway 1 in British ColumbiaEight coke drums were replaced ahead of scheduleInstalling a transformer 100% electrically.Mammoet assisted with the lifting and marshalling of...Mammoet Moment of 2025: dredging vessel decommissioningRolling an AIRPORT TERMINAL down the tarmac
Mammoet |

Installing a 2,000 tonne headframe in just HOURS

SHARE TO X SHARE TO REDDIT SHARE TO FACEBOOK WALLPAPER