Uploaded May 2026 | Updated November 2026, 16 hours ago
You'll also see the moment the very first completed door was installed inside the Chiltern Tunnel — a genuine milestone for one of the most complex infrastructure projects Britain has ever attempted.
This contract is sustaining over 130 jobs in the North West, and it's a reminder that cutting-edge British manufacturing is very much alive.
🎥 Featuring:
• How HS2's safety-critical tunnel doors are designed and built
• Behind the scenes at Booth Industries' Bolton facility
• The first completed door rolling off the production line
• Trial installation inside the Chiltern Tunnel
• What these doors actually do in an emergency
📢 Subscribe for the latest news and updates from Britain’s high-speed railway, HS2.
Follow us on social media:
💼 X: twitter.com/HS2ltd
📸 Instagram: instagram.com/hs2ltd
📘 Facebook: facebook.com/HS2ltd
🔗 LinkedIn: linkedin.com/company/high-speed-two-hs2-ltd
0:00 Introduction
0:23 Who are Booth Industries?
0:37 Details of the cross-passage doors
1:29 Repeatability and assurances
1:59 Planning to install the doors
2:43 The doors in action
3:04 The trial installation
3:34 What is a cross-passage door?
3:55 The installation process
4:11 Why is the trail installation important?
4:51 The doors in action
#HS2 #Train #Rail #Infrastructure #Construction #HighSpeedRail #Engineering
Get in touch: If you have any questions about HS2 or our ongoing works, contact our HS2 Helpdesk team:
📞 Call: 08081 434 434
📧 Email: hs2enquiries@hs2.org.uk
You'll also see the moment the very first completed door was installed inside the Chiltern Tunnel — a genuine milestone for one of the most complex infrastructure projects Britain has ever attempted.
This contract is sustaining over 130 jobs in the North West, and it's a reminder that cutting-edge British manufacturing is very much alive.
🎥 Featuring:
• How HS2's safety-critical tunnel doors are designed and built
• Behind the scenes at Booth Industries' Bolton facility
• The first completed door rolling off the production line
• Trial installation inside the Chiltern Tunnel
• What these doors actually do in an emergency
📢 Subscribe for the latest news and updates from Britain’s high-speed railway, HS2.
Follow us on social media:
💼 X: twitter.com/HS2ltd
📸 Instagram: instagram.com/hs2ltd
📘 Facebook: facebook.com/HS2ltd
🔗 LinkedIn: linkedin.com/company/high-speed-two-hs2-ltd
0:00 Introduction
0:23 Who are Booth Industries?
0:37 Details of the cross-passage doors
1:29 Repeatability and assurances
1:59 Planning to install the doors
2:43 The doors in action
3:04 The trial installation
3:34 What is a cross-passage door?
3:55 The installation process
4:11 Why is the trail installation important?
4:51 The doors in action
#HS2 #Train #Rail #Infrastructure #Construction #HighSpeedRail #Engineering
Get in touch: If you have any questions about HS2 or our ongoing works, contact our HS2 Helpdesk team:
📞 Call: 08081 434 434
📧 Email: hs2enquiries@hs2.org.uk










