Uploaded January 2025 | Updated November 2026, 5 days ago
Punch Deck - Halt State
youtube.com/watch?v=FDVONyfssCk&ab_channel=PunchDeck
youtube.com/channel/UC3M9CX5HWSw25k5QL3FkDEA
youtube.com/@PunchDeck
open.spotify.com/artist/7kdduxAVaFnbHJyNxl7FWV
punchdeck.bandcamp.com
soundcloud.com/punch-deck
instagram.com/punchdeckofficial
twitter.com/punch_deck
00:00 Introduction
00:59 Electrification work for the MAHSR corridor
01:39 Tata Semiconductor Facility in Jagiroad, Assam
02:57 Bow string girder of Road Over Bridge 543 has been successfully launched
03:30 HPCL commissioned LNG regasification terminal in Chhara
05:06 Mission Mausam
05:45 Mahindra new EV manufacturing and battery assembly facility at its Chakan plant
06:53 500th locomotive produced by Indian Railways' production unit, CLW, for FY 2024-25
07:05 Lithium-ion battery manufacturer, IBC Giga Factory in Bengaluru
07:19 Nidec Manufacturing Plant at Kotur Belur Electronics Manufacturing Cluster
07:40 Ocean Electronics group of NIOT sea trial of water ejector based floating sub-sea
feeder feeding at 10m depth at the rough sea conditions
08:34 ISRO successfully completed docking of two SPADEX satellites (SDX-01 & SDX-02)
09:41 IRCON successfully launched 76.20 m Open Web Girder rail over rail at Katni
Punch Deck - Halt State
youtube.com/watch?v=FDVONyfssCk&ab_channel=PunchDeck
youtube.com/channel/UC3M9CX5HWSw25k5QL3FkDEA
youtube.com/@PunchDeck
open.spotify.com/artist/7kdduxAVaFnbHJyNxl7FWV
punchdeck.bandcamp.com
soundcloud.com/punch-deck
instagram.com/punchdeckofficial
twitter.com/punch_deck
00:00 Introduction
00:59 Electrification work for the MAHSR corridor
01:39 Tata Semiconductor Facility in Jagiroad, Assam
02:57 Bow string girder of Road Over Bridge 543 has been successfully launched
03:30 HPCL commissioned LNG regasification terminal in Chhara
05:06 Mission Mausam
05:45 Mahindra new EV manufacturing and battery assembly facility at its Chakan plant
06:53 500th locomotive produced by Indian Railways' production unit, CLW, for FY 2024-25
07:05 Lithium-ion battery manufacturer, IBC Giga Factory in Bengaluru
07:19 Nidec Manufacturing Plant at Kotur Belur Electronics Manufacturing Cluster
07:40 Ocean Electronics group of NIOT sea trial of water ejector based floating sub-sea
feeder feeding at 10m depth at the rough sea conditions
08:34 ISRO successfully completed docking of two SPADEX satellites (SDX-01 & SDX-02)
09:41 IRCON successfully launched 76.20 m Open Web Girder rail over rail at Katni










